FIELD: oil and gas producing industry; applicable in cementing of casing strings. SUBSTANCE: method of well completion includes determination of the interval of water-bearing horizon prior to lowering of flow string; lowering of flow string. The flow string is cemented with the reduced thickness of cement stone behind the flow string against producing horizon. Solid concentric cement stone is formed against water-bearing horizon with its increased thickness behind the flow string. For this purpose, the diameter of flow string is increased against the producing horizon of reduced against the water-bearing horizon. EFFECT: higher efficiency of well completion with simultaneous provision of completion adaptability to operating conditions. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR PUMPING IN HORIZONTAL WELLS | 1992 |
|
RU2061838C1 |
GROUTING MORTAR | 1993 |
|
RU2078906C1 |
METHOD OF RECOVERY OF BOTTOM-HOLE FORMATION ZONE OF GAS WELL | 2000 |
|
RU2183724C2 |
METHOD FOR RESTORING TIGHTNESS OF CASING CLEARANCE | 1995 |
|
RU2108445C1 |
WELL COMPLETION METHOD | 1994 |
|
RU2083806C1 |
DEVICE FOR WELL COMPLETION | 1994 |
|
RU2091564C1 |
METHOD FOR COMPLETION OF WELL | 0 |
|
SU1838589A3 |
WELL COMPLETION METHOD | 2023 |
|
RU2795281C1 |
METHOD FOR RESTORING TIGHTNESS OF CASING STRINGS | 1995 |
|
RU2105128C1 |
GROUTING MORTAR | 1994 |
|
RU2082872C1 |
Authors
Dates
1997-04-27—Published
1993-07-27—Filed