FIELD: operation of oil, gas, water and other wells. SUBSTANCE: treating of down-hole zone of bed is undertaken so as to increase productivity of wells and also to enlarge permeability of rock mass. According to method, chemical reagent is introduced into well perforation interval. Then, lowered into treating zone is subsurface pressure pulse generator for treating by gas mixture in the form of successive pressure pulses at pressure value which exceeds rock pressure by 1.5-2 times. EFFECT: high efficiency. 3 cl
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR TREATING DOWN-HOLE ZONE OF WELL BED | 1996 |
|
RU2105874C1 |
WELL BOTTOMHOLE FORMATION ZONE TREATMENT METHOD | 2004 |
|
RU2262591C1 |
BOTTOMHOLE FORMATION ZONE TREATMENT METHOD | 2004 |
|
RU2262590C1 |
METHOD OF CONTROL OF MOTION OF FORMATION FLUID IN CASING STRING-BOREHOLE ANNULUS OF DEVELOPMENT WELL | 1995 |
|
RU2078923C1 |
METHOD FOR DETERMINING PHASE FLOW RATES OF GAS-LIQUID MIXTURE IN PRODUCING WELL | 1995 |
|
RU2085733C1 |
METHOD OF DETERMINING PHASE DEBITS IN OIL WELL | 1996 |
|
RU2097554C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSITS | 1996 |
|
RU2117753C1 |
METHOD AND IMMERSIBLE GENERATOR FOR TREATMENT OF BOTTOM-HOLE ZONE OF WELL BED | 1998 |
|
RU2147337C1 |
METHOD FOR COMPLETION OF GAS INJECTION WELLS | 1992 |
|
RU2094597C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSITS | 1992 |
|
RU2092679C1 |
Authors
Dates
1998-02-27—Published
1996-05-06—Filed