FIELD: oil production industry. SUBSTANCE: according to method, inserted into filter openings are cups with viscous-plastic material. Cups protrude beyond filter housing. Casing string together with filter is lowered into well, and well is then cemented. After hardening of cement mortar, lowered into well is pump-compressor pipe string together with funnel, and well is flushed. Ends of cups are cut off by means of funnel, and well is flushed once again. Productive bed is unsealed and simultaneously well is brought into operation. EFFECT: higher efficiency. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
MANNER OF OIL WELL COMPLETION | 2001 |
|
RU2200230C2 |
TECHNIQUE OF COMPLETION OF OIL WELL | 2001 |
|
RU2199658C2 |
METHOD OF OPERATION OF WELL OF MULTIFORMATION OIL FIELD | 1996 |
|
RU2100580C1 |
PROCESS OF OPENING OF PRODUCTIVE POOL | 2000 |
|
RU2175713C1 |
FILTER-SAFETY VALVE | 0 |
|
SU1102903A1 |
DEVICE FOR PERFORATION OF WELL BORE | 1996 |
|
RU2105137C1 |
WAY OF SECONDARY DEVELOPMENT OF PRODUCTIVE POOL | 2001 |
|
RU2182650C1 |
FILTER-CUTTER OF BOREHOLE SHAFT | 0 |
|
SU1578319A1 |
METHOD AT OPENING WORKING SEAM, FREE AT PERFORATING | 0 |
|
SU1765372A1 |
CUTOFF FILTER | 0 |
|
SU1763640A1 |
Authors
Dates
1998-04-10—Published
1995-12-20—Filed