FIELD: oil production industry. SUBSTANCE: according to method, wells are located in deposit according to pattern water flooding system with equal number of injection and producing wells. After drilling of wells, their bottom-hole zone is subjected to demugging. Then, performed is injection of surface-active material. Oil is recovered through producing wells. Injected through injection wells is mineralized water from lower water-bearing horizon. Undertaken is oil recovery through producing wells. Density of well pattern is determined according to following empirical formula: S = 8.2+1.5 Kprod, where: S -density of well pattern, ha/well; Kprod - coefficient of well productivity, m3/day.MPa. EFFECT: higher efficiency.
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DEVELOPMENT OF OIL DEPOSIT | 1997 |
|
RU2108450C1 |
METHOD FOR EXTRACTING OIL DEPOSIT WITH CARBONATE MANIFOLDS OF LOW PRODUCTIVENESS | 2002 |
|
RU2227207C2 |
METHOD FOR DEVELOPMENT OF OIL DEPOSIT | 1997 |
|
RU2105871C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSIT | 1997 |
|
RU2108449C1 |
METHOD FOR DEVELOPMENT OF NONUNIFORM OIL DEPOSIT | 1998 |
|
RU2117142C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSIT | 1997 |
|
RU2105870C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSIT | 1997 |
|
RU2105873C1 |
METHOD FOR EXTRACTING OIL DEPOSIT | 2004 |
|
RU2256069C1 |
OIL DEPOSIT EXTRACTION METHOD | 2004 |
|
RU2256068C1 |
METHOD OF OIL POOL DEVELOPMENT | 2001 |
|
RU2181432C1 |
Authors
Dates
1998-04-10—Published
1997-05-29—Filed