FIELD: oil extracting industry. SUBSTANCE: according to the method operation, force-pumping and water-intake wells are placed in a shrub. Square placement of wells is performed using even triangular mesh 400X400 meters. Pumping of working substance through force- pumping wells is performed according to seven-point scheme in cyclical mode. As working substance highly mineralized, thermal, layer water of lower levels is used. Pumping pressure is kept at 0.6 of mountain pressure. At collars of force- pumping wells pressure is kept at 3.0-6.0 megapascals. Intake and pumping of layer water is performed by immersible pumps in cyclical mode with periodical pumping of microbiological composition based on dry active silt into the layer. According to amount of water in operating wells, additional extraction of oil deposits in interwell space is performed by boring additional side branch wells from submerged wells. EFFECT: increased oil yield of oil deposits of complicated geological composition with minimum manifolds parameters and increased oil viscosity. 1 tbl, 1 ex, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVELOPMENT METHOD OF HETEROGENOUS OIL-BEARING FORMATION | 2008 |
|
RU2364717C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSIT | 1997 |
|
RU2108451C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSIT | 1997 |
|
RU2108449C1 |
OIL DEPOSIT DEVELOPMENT METHOD | 2014 |
|
RU2556094C1 |
METHOD FOR DEVELOPMENT OF NONUNIFORM OIL DEPOSIT | 1998 |
|
RU2117142C1 |
METHOD OF DEVELOPING OIL DEPOSITS IN FRACTURED RESERVOIRS | 2007 |
|
RU2351752C1 |
METHOD FOR DEVELOPMENT OF OIL FIELD | 1998 |
|
RU2121058C1 |
OIL DEPOSIT DEVELOPMENT METHOD | 2016 |
|
RU2635926C2 |
OIL POOL DEVELOPMENT METHOD | 1994 |
|
RU2047753C1 |
DEVELOPMENT METHOD OF OIL DEPOSIT BY WATER-FLOODING | 2012 |
|
RU2494237C1 |
Authors
Dates
2004-04-20—Published
2002-06-19—Filed