FIELD: generation of electric power on basis of thermal underground water. SUBSTANCE: steam-turbine plant for geothermal power station includes inter-well heat exchanger, turbine, generator, water-cooled condenser and geothermal circulating system which consists of inclined producing wells which diverge from sole of annular space of larger diameter which is used for forming the inter-well heat exchanger and is cased with respective string. Vertical injection well is located between inclined producing wells whose string is connected with string of increased diameter at sole of annular space by means of adapter. Outer string of larger diameter and string of injection well are connected on surface by means of pipe line which is provided with injection pump. Two strings of coaxial tubes for lowering the secondary heat-transfer agent into heating zone through central string and hoisting the superheated heat- transfer agent in inter-tube circular space are lowered inside string of injection well. EFFECT: enhanced efficiency. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
STEAM-POWER UNIT FOR GEOTHERMAL POWER PLANT | 1991 |
|
RU2035588C1 |
METHOD FOR CONCURRENT-AND-SEPARATE USE OF TWO THERMAL WATER BEARING BEDS | 1996 |
|
RU2105251C1 |
STEAM-TURBINE PLANT FOR GEOTHERMAL POWER STATION | 2003 |
|
RU2246010C1 |
METHOD OF RECYCLING ENERGY OF GEOTHERMAL WATER | 2015 |
|
RU2596293C2 |
SYSTEM OF HEAT SUPPLY AND HOT WATER SUPPLY BASED ON RENEWABLE ENERGY SOURCES | 2010 |
|
RU2445554C1 |
METHOD OF COMPLEX UTILIZATION OF GEOTHERMAL WATER | 2016 |
|
RU2650447C2 |
METHOD OF PRODUCING IRRIGATION WATER HAVING OPTIMUM CONTENT OF MINERALS | 1991 |
|
RU2028764C1 |
METHOD OF WATER WARMING UP FOR HEATING AND ASSOCIATED PLANT | 2006 |
|
RU2336466C2 |
GEOTHERMAL INSTALLATION FOR SUPPLY OF ENERGY TO CONSUMERS | 2006 |
|
RU2330219C1 |
GEOTHERMAL PLANT | 2012 |
|
RU2511993C2 |
Authors
Dates
1998-04-27—Published
1996-03-11—Filed