FIELD: energy.
SUBSTANCE: method of recycling energy of geothermal waters includes geothermal well, intermediate heat exchangers, expander with compressor on one shaft, a separator and gasholder. Evaporation and overheating of working agent supplied to the turbine geothermal power plant (GPP) is implemented in the evaporator due to high-temperature of exhaust gases of gas turbine power plant, combustion chamber of the gas from a gas holder, extracted from the thermal water, as well as gas from the main gas line.
EFFECT: invention allows improving use efficiency of geothermal waters.
1 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF COMPLEX UTILIZATION OF GEOTHERMAL WATER | 2016 |
|
RU2650447C2 |
STEAM-TURBINE PLANT FOR GEOTHERMAL POWER STATION | 2003 |
|
RU2246010C1 |
GEOTHERMAL WATER ENERGY UTILIZATION METHOD | 2001 |
|
RU2190812C1 |
METHOD FOR PREVENTION OF SCALE FORMATION IN PROCESS OF GEOTHERMAL WATERS ENERGY UTILISATION | 2008 |
|
RU2372564C1 |
HELIO-GEOTHERMAL STATION, AND ITS OPERATION METHOD | 2011 |
|
RU2459157C1 |
STEAM-POWER UNIT FOR GEOTHERMAL POWER PLANT | 1991 |
|
RU2035588C1 |
GEOTHERMAL POWER PLANT | 2021 |
|
RU2767421C1 |
STEAM-TURBINE PLANT FOR GEOTHERMAL POWER STATION | 1996 |
|
RU2110019C1 |
METHOD OF OPERATION OF COMBINED GAS-TURBINE UNIT OF GAS DISTRIBUTION SYSTEM | 2013 |
|
RU2557823C2 |
SYSTEM OF HEAT SUPPLY AND HOT WATER SUPPLY BASED ON RENEWABLE ENERGY SOURCES | 2010 |
|
RU2445554C1 |
Authors
Dates
2016-09-10—Published
2015-03-31—Filed