FIELD: gas production industry. SUBSTANCE: this relates to intensification of gas recovery from wells and ensures increased total output of gas wells of various productive capacity at minimal spending of gas bed energy. According to method, connection of low-output well and high-output well is effected with help of their contours. This is performed through ejector. Operation of wells is carried out with ejection of low-pressure gas by high-pressure gas. In this case, wells are additionally connected according to by-pass scheme. Performed is stabilization of pressure in contours. Pressure at well head is fixed. After that, wells are switched from by-pass scheme of operation to ejector operation and additional depression is created at bottom-hole of low-output well. Additional depression is obtained so as to ensure pressure differential in contours at inlet to ejecting device not over 5% of its nominal values. Device for realization of aforesaid method has receiving chamber and mixing chamber with contraction. Receiving chamber is made with tangential inlet, nozzle which is located inside, and narrowing tapered component. This components creates intermediate chamber inside receiving chamber. Intermediate chamber is connected with diffuser. All this is made for possible dispersing of liquid which accompanies gas. EFFECT: higher efficiency. 1 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR PRODUCTION OF LOW-PRESSURE GAS | 2020 |
|
RU2748792C1 |
SYSTEM FOR COLLECTION, PREPARATION AND TRANSPORTATION OF LOW-PRESSURE GAS | 2015 |
|
RU2578013C1 |
METHOD OF PRODUCTION, COLLECTION, PREPARATION AND TRANSPORTATION OF LOW-PRESSURE GAS-LIQUID MIXTURE AT THE DEVELOPMENT OF GAS-CONDENSATE DEPOSIT | 2017 |
|
RU2657910C1 |
METHOD FOR OPERATION OF GROUP OF WATERING WELLS | 2018 |
|
RU2679174C1 |
METHOD OF OPERATING WATERED GAS WELLS | 2018 |
|
RU2687706C1 |
METHOD FOR GROUP RESEARCH OF CLUSTER GAS AND GAS-CONDENSATE WELLS IN STATIONARY FILTRATION MODES | 2007 |
|
RU2338877C1 |
METHOD OF WELL COMPLETION | 2001 |
|
RU2215136C2 |
METHOD OF OPERATING GAS FIELD IN COLLECTOR-BEAM ARRANGEMENT SCHEME COLLECTION AT FINAL STAGE OF DEPOSIT DEVELOPMENT | 2015 |
|
RU2597390C1 |
METHOD FOR OPERATING GAS WELLS AT LATER STAGE OF NATURAL GAS FIELD DEVELOPMENT AND DEVICE FOR ITS IMPLEMENTATION | 2021 |
|
RU2760183C1 |
METHOD OF PREPARING AND SUPPLYING HETEROGENEOUS MIXTURES TO FORMATION, AND PLANT FOR METHOD'S IMPLEMENTATION | 2008 |
|
RU2389869C1 |
Authors
Dates
1998-05-10—Published
1994-08-02—Filed