FIELD: oil and gas industry.
SUBSTANCE: in compliance with inventions, heterogeneous mixtures are prepared and supplied to formation through at least one well. Phases of liquid and gas of various pressure are mixed with ejection, and certain volume ratio of phases and control of this ratio is reached. According to inventions, volume ratio of mixed phases is controlled and maintained with determination of their optimum ratio in mode of continuous monitoring with feedback along supply line with well injection capacity coefficient and depending on the depth of its perforation interval, structural geometric dimensions of system of casing pipes and tubing, pressures in liquid and gas phase supply line. At that, ejection at mixing is performed with automatic selection of active and passive phases along feedback line, and hydrodynamic instability of speeds and pressures in flows is created both at ejection and supply of mixture to the formation.
EFFECT: increasing efficiency of the method and enlarging functional capabilities of the device at decrease of material costs.
18 cl, 1 ex, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DEVELOPMENT OF OIL FORMATION | 1994 |
|
RU2078200C1 |
METHOD AND DEVICE FOR OIL POOL DEVELOPMENT | 2003 |
|
RU2266396C2 |
METHOD OF INCREASE OF RESERVOIR RECOVERY BY INJECTION OF WATER-GAS MIXTURE | 2013 |
|
RU2542059C2 |
TREATMENT METHOD OF PRODUCTIVE FORMATION, AND DOWNHOLE EQUIPMENT FOR ITS IMPLEMENTATION | 2010 |
|
RU2478778C2 |
DOWNHOLE EQUIPMENT FOR POLYFREQUENCY WAVE TREATMENT OF BOTTOM-HOLE ZONE OF PRODUCTIVE FORMATION AND FLOWRATE OSCILLATIONS GENERATOR FOR THAT | 2014 |
|
RU2574651C1 |
PHYSICAL EFFECT METHOD USED DURING DEVELOPMENT OF HYDROCARBON DEPOSIT, AND BORE-HOLE PLANT FOR METHOD'S REALISATION | 2007 |
|
RU2366806C1 |
METHOD FOR TREATING BOTTOM-HOLE ZONE OF BED | 1994 |
|
RU2128770C1 |
METHOD FOR ISOLATION OF WATER INFLUX, GAS INFLUX OR LOST CIRCULATION ZONES | 2002 |
|
RU2228437C2 |
PRODUCTION BED TREATMENT METHOD | 2004 |
|
RU2258803C1 |
METHOD FOR HYDRAULIC FRACTURING OF PRODUCTIVE FORMATION | 2012 |
|
RU2584191C2 |
Authors
Dates
2010-05-20—Published
2008-10-13—Filed