FIELD: construction engineering. SUBSTANCE: construction borer has ground collector made in the form of auger flight with flange, and extending cutter located above ground collector which is pressure-forced to working position and is provided with system of removing ground from surface in the form of rope. Borer shaft is provided with handle. Cutting edges of cutter and auger are directed in opposite sides. Borer shaft is located between cutter turning axle and cutter itself and this allows for using it in manual boring and building of foundations without need for large amount of earth work and without application of load lifting and carrying facilities. EFFECT: higher efficiency. 1 cl, 13 dwg
Title | Year | Author | Number |
---|---|---|---|
CONSTRUCTION DRILL | 1999 |
|
RU2160815C2 |
PROCESS OF BUILDING OF ANTISEISMIC FOUNDATION | 2002 |
|
RU2221112C1 |
HAND DRILL FOR HOLE PERFORATION IN GROUND (VARIANTS) | 2004 |
|
RU2262579C1 |
PROGRESSIVE SHUTTERING MOLD | 1992 |
|
RU2044855C1 |
INSTALLATION FOR SINKING AND PULLING OUT OF PILES | 2001 |
|
RU2208090C1 |
VIBRATION DRILL FOR FABRICATION OF DRILLED CONCRETE PILES IN SOIL | 2009 |
|
RU2392384C1 |
ROCK CRUSHER | 2014 |
|
RU2569117C1 |
DEVICE FOR DRILLING WELLS IN LOOSE MINE ROCKS | 2009 |
|
RU2425206C1 |
DEVICE FOR DRILLING HOLE FOR BORED SCREW PILE FORMING | 2003 |
|
RU2261955C2 |
METHOD FOR INSTALLATION OF SCREW PILE IN PERMAFROST SOILS AND HELICAL SCREW FOR IMPLEMENTATION OF METHOD | 2022 |
|
RU2786081C1 |
Authors
Dates
1998-06-27—Published
1996-09-26—Filed