FIELD: construction.
SUBSTANCE: invention relates to the field of construction of buildings and structures in areas with complex engineering and geocryological conditions, namely to a method for installation of screw piles in permafrost soils and a helical screw. The method for installation of a screw pile in permafrost soils includes drilling of a well with excavation of the soil by means of a drilling mechanism containing a movable part with a trunk, a screw located on it, extraction of the movable part from the well by means of reverse rotation, installation of the screw pile. First, a cylindrical well is drilled, in which, then, thread is cut, or drilling of the cylindrical well is performed simultaneously with thread cutting. An outer diameter of thread of a screw well is not less than an outer diameter of the screw pile. When cutting thread, a rotational moment is applied to head or tail part of the trunk. The screw pile is rolled-welded with a multiturn screw blade, and cutters for thread cutting are located on at least part of a spiral flange of the screw, and at least part of the flange of the screw is made conical. Cutters are installed in such a way that a profile and a step of thread in the well correspond to a profile and a step of the screw blade of the pile. Installation of the screw pile is carried out by its screwing by thread of the screw-like well.
EFFECT: simplification of a process and reduction in time of installation of a screw pile, universalization of the process, increase in the reliability and control of installation, possibility of repairment and replacement of screw piles.
5 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCESS OF MANUFACTURE OF BORING PILE | 2001 |
|
RU2220256C2 |
SET PILE, ASSEMBLY METHOD OF COMPOSITE PILE AND IMMERSION METHOD THEREOF BY METHOD OF ROTARY DRILLING WITHOUT AXIAL LOAD ON UPPER END OF PILE | 2018 |
|
RU2709873C2 |
DEVICE FOR DRILLING HOLE FOR BORED SCREW PILE FORMING | 2003 |
|
RU2261955C2 |
METHOD FOR CONSTRUCTION OF PILES IN ROCK AND PERMAFROST SOILS | 2020 |
|
RU2724651C1 |
METHOD FOR MAKING WELL FOR ROLLED-SCREW PILE AND DEVICE FOR ITS REALISATION | 2007 |
|
RU2394961C2 |
METHOD OF DRILLING INJECTION PILE | 2023 |
|
RU2817842C1 |
METHOD OF DRIVING TUBULAR PILE INTO PERMAFROST | 1997 |
|
RU2128270C1 |
METHOD OF DRILL-INJECTION STILT FORMATION | 2006 |
|
RU2327007C1 |
PILE AND METHOD OF ITS INSTALLATION INTO PERMAFROST SOIL | 2010 |
|
RU2441116C1 |
METHOD FOR SINKING SCREW PILES INTO PERMAFROST SOIL | 2016 |
|
RU2630338C1 |
Authors
Dates
2022-12-16—Published
2022-07-19—Filed