FIELD: oil and gas production. SUBSTANCE: in a method when horizontal hole is filled with solvent for removing asphalt-tar and paraffin deposits and, after required pause, solvent is removed, distinguishing feature consists in that, in horizontal hole, 30-50-m sections are chosen, depth of the middle part of each section is measured, and sections are treated successively from the highest section to lowest one. Treatment is carried out with the aid of a source of pulse-depression action that is successively installed in each treatment section, while hole fluid is withdrawn from each treatment section. EFFECT: increased productivity of well. 2 cl
Title | Year | Author | Number |
---|---|---|---|
PROCEDURE FOR TREATMENT OF BOTTOMHOLE ZONE OF PRODUCER | 2013 |
|
RU2527085C1 |
METHOD FOR TREATING BOTTOM-HOLE ZONE OF PRODUCING WELL | 1998 |
|
RU2117145C1 |
METHOD FOR TREATMENT OF FACE-ADJACENT WELL AREA | 2004 |
|
RU2244808C1 |
METHOD FOR ACID TREATMENT OF CARBONATE FORMATION | 2015 |
|
RU2579042C1 |
METHOD FOR THERMOCHEMICAL TREATMENT OF BOTTOM-HOLE ZONE | 2014 |
|
RU2566157C1 |
METHOD FOR COMPLEX WELL BOTTOM ZONE TREATMENT | 2004 |
|
RU2261986C1 |
METHOD FOR TREATING BOTTOM-HOLE ZONE OF INJECTION WELL | 1998 |
|
RU2117146C1 |
METHOD FOR ISOLATION OF WATER INFLOW IN HORIZONTAL OR INCLINED PRODUCING WELLS | 1997 |
|
RU2101484C1 |
PRODUCTIVE BOTTOMHOLE FORMATION ZONE TREATMENT METHOD | 2004 |
|
RU2271443C1 |
METHOD FOR BOTTOMHOLE FORMATION AREA TREATMENT | 2004 |
|
RU2268997C1 |
Authors
Dates
1998-08-10—Published
1998-03-12—Filed