FIELD: mining industry; may be used in well operation. SUBSTANCE: method includes formation in zone of perforation of the first bath of aqueous solution of acid salt of alkali metal, its holding and removal; formation of the second bath of aqueous solution of hydrochloric acid, its holding and removal. Added to aqueous solution of hydrochloric acid is potassium chloride with concentration of 0.2-2 wt.%. The first bath is removed by displacement and replacement with initial volume of aqueous solution of hydrochloric acid with potassium chloride in the course of formation of the second bath. Initial volume of aqueous solution of hydrochloric acid with potassium chloride after holding is displaced from perforation zone upward by injection of displacing fluid. Displacing fluid is used in the form of said aqueous solution of hydrochloric acid with potassium chloride. The solution is forced through perforation zone to bottom-hole formation zone and held there. The second bath is removed by washing. EFFECT: higher efficiency of demudding of wells and increased well production rate. 8 cl
Title | Year | Author | Number |
---|---|---|---|
PROCESS OF REMOVE MUD FROM WALLS OF WELL WITH USE OF REAGENTS | 1998 |
|
RU2200834C2 |
METHOD OF WELL REAGENT DEMUDDING | 1999 |
|
RU2160831C2 |
METHOD FOR REAGENT CLAY CAKE REMOVAL FROM WELL | 2011 |
|
RU2484244C1 |
METHOD OF TREATMENT AND DEMUDDING OF BOTTOM-HOLE ZONE OF DEVELOPMENT WELLS | 2000 |
|
RU2172824C1 |
METHOD OF FORMATION REOPENING | 1999 |
|
RU2160827C1 |
TECHNOLOGY OF REPEAT OPENING OF STRATUM | 2001 |
|
RU2183257C1 |
METHOD FOR THERMOCHEMICAL TREATMENT OF HOLE BOTTOM ZONE | 1992 |
|
RU2023874C1 |
METHOD FOR TREATMENT OF BOTTOM-HOLE FORMATION ZONE | 1994 |
|
RU2068086C1 |
METHOD FOR OPERATING DEEP PUMP PLANT | 1995 |
|
RU2061175C1 |
METHOD OF TREATMENT OF BOTTOMHOLE FORMATION ZONE WITH HIGH-PERMEABILITY FRACTURES OF HYDRAULIC FRACTURING OF FORMATION | 2018 |
|
RU2702175C1 |
Authors
Dates
1998-10-20—Published
1997-12-11—Filed