FIELD: oil production; applicable in completion and stimulation of producing wells. SUBSTANCE: device has tubing installed in well. Connected to well is compressor to supply compressed air for lowering of fluid level in well annular space and subsequent discharge of well to atmosphere. There is water supply line. Installed in air supply line from compressor to well is jet nozzle for spraying water in the amount sufficient for maintenance of humidity of gas-air mixture in well of not below 70% to preclude explosion-hazardous situations. EFFECT: excluded formation of spark discharge of static electricity. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR PULSE EXCITATION OF OIL POOL | 1997 |
|
RU2151280C1 |
METHOD AND DEVICE FOR WELL COMPLETION | 0 |
|
SU1809017A1 |
BOREHOLE VALVE DEVICE | 1992 |
|
RU2039211C1 |
METHOD AND DEVICE FOR TREATING DEPOSIT BY ELASTIC VIBRATIONS | 1995 |
|
RU2105143C1 |
METHOD FOR DEVELOPING WELL AFTER HYDRAULIC FRACTURING | 2016 |
|
RU2630930C1 |
METHOD FOR PULSED WELL BOTTOM ZONE TREATMENT | 2006 |
|
RU2310059C1 |
METHOD OF DEVELOPMENT OF NONUNIFORM WATER- ENCROACHED OIL FORMATIONS | 1996 |
|
RU2143548C1 |
METHOD FOR CLEANING FACE-ADJACENT BED AREA | 2003 |
|
RU2246610C1 |
METHOD FOR WELLS MASTERING | 0 |
|
SU1761943A1 |
STIMULATION METHOD OF FORMATION FLUID INFLUX FROM WELL | 2011 |
|
RU2485302C1 |
Authors
Dates
1998-11-27—Published
1996-07-18—Filed