FIELD: mining industry; operation and construction of underground reservoir storage. SUBSTANCE: proposed method provides for sealing of reservoir in top and sole, drop of excess pressure from outer surface of pipe casings by forming hydrodynamic coupling of casing string annulus and inner surface of casings through passages in form of holes. Passages are made before mounting and lowering of casing strings into well and are overlapped by system of relied valves by means of which pressure is reduced in annuals automatically when it rises near outer surface of casing strips to value close to or equal to 2/3 rds of tolerable collapsing pressure. Passages can be made in connecting members of casing strips. EFFECT: provision of conditions preventing collapsing of casing string sealed in underground reservoir. 2 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR WELL CASING PIPE DEFORMATION PREVENTION WITHIN PLASTIC SALT DEFORMATION INTERVAL | 2004 |
|
RU2278950C2 |
METHOD OF DRILLING AND CASING-OFF BOREHOLES IN FLOATABLE SALT-BEARING ROCKS | 0 |
|
SU1803536A1 |
METHOD FOR WELL CASING IN FLOW ROCKS | 1993 |
|
RU2066735C1 |
METHOD OF BOREHOLE FIXING | 1993 |
|
RU2057904C1 |
METHOD FOR INSOLUBLE ROCK SEAM BREAKING THROUGH WELL DURING UNDERGROUND RESERVOIR BUILDING IN SOLUBLE ROCK | 2005 |
|
RU2283953C1 |
METHOD FOR CONSTRUCTING DOUBLE-DECK UNDERGROUND RESERVOIR IN ROCK SALT LAYER | 2023 |
|
RU2812756C1 |
METHOD FOR MINING DEPOSITS OF SOLUBLE ROCKS OCCURRING UNDER BEDS OF LESS SOLUBLE ROCKS | 1992 |
|
RU2042586C1 |
METHOD OF JOINING WELLS IN SOLUBLE ROCK BEDS | 1992 |
|
RU2038469C1 |
METHOD FOR WELL CONSTRUCTION | 1991 |
|
RU2012777C1 |
METHOD FOR CEMENTATION OF WELLS | 1996 |
|
RU2123576C1 |
Authors
Dates
1999-01-27—Published
1996-11-05—Filed