FIELD: mining industry. SUBSTANCE: method provides for forming chamber in rock producing bed through wells furnished with casing and and pipe strings. Casing is run into producing bed mass. Solvent is supplied into pipe string, and brine is removed through pipe string-casing annulus. In course of development of chamber, position of its roof is controlled. When chamber roof approaches the upper boundary of producing bed, the solvent supply efficiency is established such that concentration of productive brine in chamber reaches value characterized by low dissolving in it of salts contained in upper beds of barren rocks that predetermines further development of chambers along the strike of producing bed. EFFECT: provided removal of soluble rock in form of clean product noncontaminated with petroleum products and salt impurities. 2 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF JOINING WELLS IN SOLUBLE ROCK BEDS | 1992 |
|
RU2038469C1 |
DEVICE FOR CONSTRUCTION OF UNDERGROUND RESERVOIR IN SOLUBLE FORMATIONS | 1993 |
|
RU2041143C1 |
SHUTOFF DEVICE FOR FLOW STRINGS OF WELL OF LIQUID HYDROCARBONS UNDERGROUND STORAGE | 1992 |
|
RU2057692C1 |
DEVICE FOR CONSTRUCTING HORIZONTAL WORKINGS IN ROCK SALT | 1991 |
|
RU2014269C1 |
LONG-RANGE HYDRAULIC APPARATUS FOR CREATING SPACES IN SOLUBLE ROCK FORMATIONS | 1993 |
|
RU2081308C1 |
UNDERGROUND RESERVOIR WELL SHUTOFF DEVICE | 1992 |
|
RU2069160C1 |
WELL FLOW BREAKER | 1995 |
|
RU2091284C1 |
METHOD FOR BUILDING UNDERGROUND RESERVOIR IN DEPOSITS OF ROCK SALT | 1991 |
|
RU2068806C1 |
METHOD FOR CREATING UNDERGROUND RESERVOIRS IN ROCK SALT FORMATIONS AND UNDERGROUND RESERVOIR DESIGNS FOR IMPLEMENTING THE SAME | 1991 |
|
RU2068805C1 |
METHOD OF CREATING UNDERGROUND STORAGE IN SOLUBLE ROCKS | 2004 |
|
RU2256596C1 |
Authors
Dates
1995-08-27—Published
1992-11-11—Filed