FIELD: oil and gas production industry. SUBSTANCE: method can be used for isolation of flooded beds in producing wells. According to method, packer is installed above water-appearing part of bed. Hydrocarbon liquid is injected into productive part of bed through annular space. Hydrocarbon liquid is forced down by gas and created is gas supersaturated zone of higher pressure. After that, injected through pipe-compressor pipes into water-appearing part of bed is plugging agent. Higher pressure zone which is supersaturated with gas is created so that its radius is larger than radius of injecting plugging agent. Pressure is maintained in this zone at level not lower than plugging agent injection pressure. EFFECT: retention of permeability of productive bed zone with high quality plugging of water-appearing part of bed. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCESS OF ISOLATION OF INFLOW OF STRATAL WATER | 2000 |
|
RU2186935C2 |
METHOD FOR INTENSIFYING INFLOW OF HYDROCARBONS TO WELL | 1998 |
|
RU2127806C1 |
WELL COMPLETION METHOD | 1998 |
|
RU2127805C1 |
METHOD FOR COMPLETION OF WELL CONSTRUCTION | 1998 |
|
RU2134341C1 |
METHOD FOR SHUTOFF OF WATER INFLOW OF BOTTOM WATER IN GAS WELLS UNDER CONDITIONS OF ABNORMALLY LOW FORMATION PRESSURES | 1996 |
|
RU2121569C1 |
METHOD OF SUPPLY OF HYDROCARBONS FROM WATERING OUT FORMATION | 2009 |
|
RU2393343C1 |
METHOD OF SHUTOFF OF FORMATION WATER INFLOW | 2001 |
|
RU2206733C2 |
METHOD OF INSULATING FORMATION WATER INFLOW | 2003 |
|
RU2244115C1 |
METHOD INCREASING PRODUCTIVITY OF OIL WELL | 1998 |
|
RU2144135C1 |
METHOD FOR LIMITING INFLUX OF WATER INTO PRODUCTION WELL | 2009 |
|
RU2392419C1 |
Authors
Dates
1999-03-20—Published
1998-04-09—Filed