FIELD: oil and gas production. SUBSTANCE: invention can be used for fixing casing strings in oil and gas wells. Lower dividing plug is run into borehole and cement mortar is pumped in. Then upper dividing plug is run down and space above it is filled with forcing fluid. Cement mortar is forced through membrane of lower plug. When the two plugs are joined, their position is fixed by anchor mounted on upper plug. After anchor is opened, pressure on forcing fluid is reduced. Mortar during its hardening period is affected by vibrator. EFFECT: reduced probability of microfissures and reduced cementation quality. 4 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR REPAIR OF OIL AND GAS WELLS | 1997 |
|
RU2134769C1 |
METHOD OF SECURING A HIDDEN CASING STRING OF A BOREHOLE WITH ROTATION AND CEMENTING OF THE ZONE ABOVE THE PRODUCTIVE FORMATION | 2020 |
|
RU2745147C1 |
CEMENTING DEVICE AND METHOD FOR CASING PIPE WITH TWO CEMENTING PLUGS | 2005 |
|
RU2299309C2 |
APPARATUS FOR CEMMENTING WELL CASINGS THROUGH SMALLER-DIAMETER PIPE STRING | 0 |
|
SU1002530A1 |
CASING COLUMN CEMENTATION METHOD AND DEVICE FOR REALIZATION THEREOF | 2004 |
|
RU2293838C2 |
METHOD OF PRODUCING FORMATION INSULATION DURING CEMENTATION OF CASING PIPE | 2006 |
|
RU2330933C1 |
METHOD FOR COMPLETION OF HORIZONTAL WELL OF SMALL DIAMETER | 2012 |
|
RU2490426C1 |
APPARATUS FOR DOUBLE-STAGE CEMENTING OF CASINGS | 0 |
|
SU1289982A1 |
ARRANGEMENT FOR SECURING LARGE-DIAMETER WELLS | 0 |
|
SU1539319A1 |
METHOD FOR MULTISTAGE WELL CEMENTING AND SET OF EQUIPMENT THEREFOR | 2015 |
|
RU2576253C1 |
Authors
Dates
1999-07-10—Published
1997-06-11—Filed