FIELD: oil and gas industry.
SUBSTANCE: method involves drilling of a well by a bit with diameter of 144-155.6 mm. At that at the end of the production string with nominal diameter of 102-114 mm a baffle plate, strata cutting packer and stage cementing collar are installed; the production string is ran-in into a horizontal part of the well; the plug is installed into the baffle plate by mud circulation; then pressure in the production string is increased till the cutting packer and thereafter holes of the stage cementing collar are open; 2-4 m3 of drill mud are pumped at pressure of 8-11 MPa and flow rate of 10-15 l/s; flush mud containing 1-3% of surface-active substance is pumped in volume of 3-10 m3 at pressure of 6-8 MPa and flow rate of 5-10 l/s; then calculated volume of cement grout is pumped at pressure of 6 - 10 MPa and flow rate of 5-10 l/s; by displacing liquid the by-pass plug is displaced till setting of the stage cementing collar and closure of its apertures at pressure from 6 up to 14 MPa and flow rate of 5-10 l/s; then pressure is vented and a check is made to prove unavailability of a drain in tubular annulus; then waiting on cement hold is made, the baffle plate, strata cutting packer and stage cementing collar are drilled out and the well is developed.
EFFECT: cementing of the horizontal production string of small diameter.
Title | Year | Author | Number |
---|---|---|---|
COMPLETION METHOD FOR WELL WITH HORIZONTAL SHAFT | 2014 |
|
RU2541981C1 |
COMPLETION METHOD OF HORIZONTAL WELL | 2014 |
|
RU2541979C1 |
COMPLETION METHOD FOR WELL WITH HORIZONTAL SHAFT | 2014 |
|
RU2541980C1 |
METHOD FOR COMPLETING A HORIZONTAL SIDETRACK BOREHOLE FOLLOWED BY MULTI-STAGE HYDRAULIC FRACTURING | 2021 |
|
RU2775628C1 |
METHOD FOR CONSTRUCTING SIDETRACK WITH HORIZONTAL ENDING | 2014 |
|
RU2553732C1 |
WELL STAGE CEMENTING METHOD | 2016 |
|
RU2606744C1 |
WELL CONSTRUCTION METHOD | 2008 |
|
RU2375551C1 |
METHOD FOR SELECTIVE ISOLATION OF PRODUCTIVE RESERVOIR AT CEMENTATION OF PRODUCTION STRING | 1993 |
|
RU2087674C1 |
METHOD OF CONSTRUCTION OF HORIZONTAL WELL | 2014 |
|
RU2551592C1 |
WELL STAGE CEMENTING METHOD | 2014 |
|
RU2547863C1 |
Authors
Dates
2013-08-20—Published
2012-10-04—Filed