FIELD: preparation of pulverized coal fuel at thermal power stations. SUBSTANCE: the installation consists of a group of mills, whose quantity in each group is not less than two. All mills in a group have similar diameters of drums, but different their lengths and diameters of the mouths, the mouths are made for interchangeability in a row. The ratio of mill drum lengths to their diameter is within 0.3 to 1.2. The armor plates are of the same standard size. All mills are furnished with drives of the same type designed for the most powerful mill of the group. The degree of mill drum filling with balls is constant and may make up 0.28 to 0.30 of their capacity. The drum rotary speed is constant and may not exceed 0.8 to 1.0 of the critical one, the mill capacity may be calculated by formula. EFFECT: enhanced capacity, reduced specific expenditures, improved maintainability, reduced specific quantity of metal per structure and power intensity. 4 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF PREPARING COAL-DUST FUEL | 1981 |
|
SU1056501A1 |
METHOD OF BURNING OIL COKE | 1997 |
|
RU2128806C1 |
METHOD OF BURNING DUST-LIKE FUEL | 1994 |
|
RU2087799C1 |
METHOD OF STEP-BY-STEP BURNING OF FUEL-AIR MIXTURE IN PULVERIZED-COAL FIRED BOILERS | 1991 |
|
RU2037098C1 |
DEVICE FOR PROTECTION OF INTERNAL SURFACE OF STEAM-BOILER DRUMS FROM THERMAL STRESSES | 1998 |
|
RU2145033C1 |
METHOD OF THREE-STEP COMBUSTION OF FUEL-AIR MIXTURE IN COAL-FIRED BOILERS | 1997 |
|
RU2134377C1 |
DUST-COAL BURNER | 1994 |
|
RU2062947C1 |
METHOD OF OPERATION OF STEAM BOILER | 2000 |
|
RU2175420C1 |
METHOD AND SYSTEM FOR BURNING SOLID PULVERIZED FUEL | 1992 |
|
RU2088848C1 |
DRUM-SEPARATOR | 1998 |
|
RU2151950C1 |
Authors
Dates
1999-09-10—Published
1997-08-11—Filed