FIELD: oil production industry. SUBSTANCE: method is aimed at increasing oil recovery from beds and reducing flooding of producing wells. According to method, successively injected through injection wells is isolating Material which ensures levelling of injectivity profile, also injected is forcing-out agent. Prior to injection operations, collecting properties of beds are revealed in section of deposit. Used for isolation of high-permeable zones are polymer-dispersive systems. Used for fissured reservoirs are gel-forming compounds which fully plug fissures and prevent passing of forcing-out agent. Used for reservoirs of low or medium permeability are solutions of inorganic salts and alkalis which create settlements in result of their interaction. Forcing-out agent has viscosity which exceeds viscosity of oil in bed conditions and its interphase tension is not over 2.5 mN/m. Forcing-out agent is injected in amount of 20-30 thousand cub.m from combined pumping station. Application of aforesaid method ensures reduction of water recovery together with increasing coefficient of oil recovery from deposit. EFFECT: higher efficiency. 2 cl
Title | Year | Author | Number |
---|---|---|---|
PROCEDURE LEVELING PROFILE OF ACCEPTANCE OF INJECTION WELLS | 2000 |
|
RU2175053C1 |
METHOD OF OIL RECOVERY FROM FORMATION | 2000 |
|
RU2186953C2 |
METHOD OF DEVELOPMENT OF OIL DEPOSIT AT LATE STAGE | 2001 |
|
RU2209302C2 |
METHOD OF DEVELOPMENT OF WATER-FLOODED POOL | 1998 |
|
RU2143059C1 |
METHOD OF DEVELOPMENT OF WATER-ENCROACHED OIL DEPOSIT | 2000 |
|
RU2169256C1 |
METHOD OF OIL POOLS DEVELOPMENT | 1998 |
|
RU2149985C1 |
METHOD OF DEVELOPING WATER-FLOODED OIL POOL | 2001 |
|
RU2194155C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSIT | 1996 |
|
RU2117143C1 |
METHOD OF DEVELOPMENT OF WATER-ENCROACHED OIL POOL WITH NONUNIFORM GEOLOGICAL STRUCTURE | 2000 |
|
RU2187628C1 |
METHOD OF TREATING TERRIGENOUS AND CLAY OIL RESERVOIRS | 1999 |
|
RU2165013C1 |
Authors
Dates
1999-10-10—Published
1998-07-13—Filed