FIELD: methods of development of oil pools at late stage of development. SUBSTANCE: method may be used in development of oil pools with reservoirs nonuniform in section and separated by clay partings. Oil pool is drilled with injection and producing wells. Isolating compositions are injected into formation. Water inflows to producing wells are shutoff. Oil displacement front is equalized. Wells are shutdown for period required for redistribution of formation pressure. Isolating compositions are injected into injection wells which are shutdown before injection of isolating compositions for 10-15 days for reduction of pressure in the most permeable interlayers. EFFECT: higher efficiency of physico-chemical stimulation of formation with reduction of reagent consumption and active involving of low-drainable oil resources into development. 2 cl
Title | Year | Author | Number |
---|---|---|---|
PROCEDURE LEVELING PROFILE OF ACCEPTANCE OF INJECTION WELLS | 2000 |
|
RU2175053C1 |
METHOD OF OIL RECOVERY FROM FORMATION | 2000 |
|
RU2186953C2 |
METHOD FOR DEVELOPMENT OF OIL DEPOSIT AT LATE STAGE OF OPERATION | 1998 |
|
RU2139419C1 |
METHOD OF DEVELOPING WATER-FLOODED OIL POOL | 2001 |
|
RU2194155C1 |
METHOD OF DEVELOPMENT OF OIL DEPOSIT AT LATE STAGE | 2001 |
|
RU2209302C2 |
METHOD OF OIL POOL DEVELOPMENT | 2001 |
|
RU2209300C2 |
METHOD FOR ISOLATION OF BRINE WATER INFLOW | 1996 |
|
RU2114991C1 |
METHOD FOR EXPLOITATION OF OIL DEPOSITS | 1993 |
|
RU2065040C1 |
COMPOUND FOR LIMITATION OF BRINE WATER INFLOW | 1996 |
|
RU2109939C1 |
METHOD OF DEVELOPMENT OF WATER-ENCROACHED OIL DEPOSIT | 2000 |
|
RU2169256C1 |
Authors
Dates
2000-05-27—Published
1998-06-22—Filed