FIELD: mechanical engineering. SUBSTANCE: proposed gas turbine plant has high-and low-pressure compressors, and main chamber coupled with high-pressure turbine and with low-pressure turbine. Intermediate heating combustion chamber is installed between high-pressure and low-pressure turbines. Two intermediate heating ring combustion chambers are arranged in peripheral parts of housing of high-pressure and low-pressure turbines. Inlets of cooling ducts of high-pressure turbine and low-pressure turbine are coupled with fuel-feed manifolds introduced additionally into turbine blade spaces. Outlets of corresponding ducts of turbines are connected with corresponding intermediate heating combustion chambers. EFFECT: increased efficiency of gas turbine plant. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
COMBINED-CYCLE PLANT | 1999 |
|
RU2163671C1 |
COMBINED-CYCLE PLANT | 1998 |
|
RU2139430C1 |
GAS TURBINE ENGINE OPERATING METHOD AND GAS TURBINE ENGINE | 2019 |
|
RU2726861C1 |
GAS TRANSFER UNIT | 2020 |
|
RU2735881C1 |
METHOD OF FORCING GAS TURBINE PLANT | 2018 |
|
RU2674089C1 |
GAS TRANSFER UNIT | 2020 |
|
RU2735040C1 |
METHOD OF GAS-TURBINE UNIT OPERATION | 0 |
|
SU1775561A1 |
HIGHLY-EFFICIENT LOW POWER STEAM-AND GAS PLANT | 1999 |
|
RU2160370C2 |
ROTARY ENGINE | 1995 |
|
RU2095589C1 |
GAS TURBINE ENGINE WITH ADDITIONAL BLADES-NOZZLES OF FIRE HEATING | 2023 |
|
RU2826042C1 |
Authors
Dates
2000-03-20—Published
1998-11-23—Filed