FIELD: mining industry. SUBSTANCE: method relates to drilling gas wells with regulated hydrostatic pressure in bore-hole and it can be used in opening of high-capacity beds with abnormally high bed pressure. According to method, at initial moment of bed opening, calculated in compliance with formula is minimal density of drilling fluid. Opening is performed with drilling fluid ensuring minimal calculated density. Before start of drilling, determined is hydraulic pressure loss in circular space, and created is initial mouth pressure after mechanical sealing of mouth. First interval of productive bed is drilled under constant watching of pressure value in pipes during defined checking period. Depression on bed is created in case of permanent value of pressure in pipes in process of drilling subsequent intervals during defined checking period for first interval by regular reduction of mouth pressure. If pressure in pipes is reduced, process of sinking and washing well is discontinued. Well is closed and according to value of pressure in pipes determined is actual bed pressure. After that, minimal density of drilling fluid is corrected by using for example barite. Washing of well is restarted at former productive capacity of pumps, and gas cut drilling fluid is washed out. Washing-out process is carried out with maintaining permanent pressure in pipes at which no gas enters well. For opening of remaining part of productive bed, depression at top is brought to safety level by creating mouth pressure. Value of mouth pressure is determined according to formula. Pressure in pipes is measured and value of this pressure is maintained during subsequent drilling down to bed floor by controlling mouth pressure. Application of aforesaid method ensures safety and high quality of opening at depression on productive bed in conditions of abnormally high bed pressure. EFFECT: higher efficiency. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF PRODUCING GAS-BEARING FORMATION DRILLING-IN | 2000 |
|
RU2196869C2 |
TECHNOLOGY TO CLEAR HORIZONTAL WELL FROM SAND PLUG IN PROCESS OF OVERHAUL | 1999 |
|
RU2165007C2 |
METHOD OF RECOVERY OF BOTTOM-HOLE FORMATION ZONE OF GAS WELL | 2000 |
|
RU2183724C2 |
PROCESS OF OPENING OF PRODUCTIVE INCLINED SEAM WITH PRESSURE MODE OF PRODUCTION OF HYDROCARBONS | 1999 |
|
RU2165514C1 |
METHOD OF WELL COMPLETION | 2001 |
|
RU2215136C2 |
METHOD OF WELL STAGE CEMENTING UNDER CONDITIONS OF ABNORMALLY LOW FORMATION PRESSURES IN LOST CIRCULATION ZONE | 2000 |
|
RU2188302C2 |
BOREHOLE PERFORATION FLUID | 2001 |
|
RU2206720C2 |
METHOD OF INSTALLATION OF CEMENT BRIDGE | 1999 |
|
RU2170334C2 |
METHOD OF WELLBORE CLEANING | 1999 |
|
RU2168000C2 |
METHOD FOR WELL CEMENTATION | 2002 |
|
RU2232258C2 |
Authors
Dates
2000-05-10—Published
1998-07-14—Filed