METHOD OF RECOVERY OF BOTTOM-HOLE FORMATION ZONE OF GAS WELL Russian patent published in 2002 - IPC

Abstract RU 2183724 C2

FIELD: gas producing industry; applicable in recovery of bottom-hole formation zone and isolation of water inflow in casing string - borehole annulus in major repair of gas wells. SUBSTANCE: method includes preparation of oil-emulsion grouting slurry. Volumes of portions of oil-emulsion grouting slurry and displacing fluid are calculated by empirical formulas. Oil-emulsion grouting slurry is injected and forced through tubing string with simultaneous withdrawal of gas through tubing string. Depression on formation is gradually increased up to beginning of formation water carrying out. In the course of injection and forcing of oil-emulsion grouting slurry, value of actual wellhead gas pressure is compared with its maximum permissible value which is determined by empirical formula. Upon attainment of maximum value of wellhead gas pressure, gas bleeding off is started. Bleeding off rate is calculated by empirical formula. Gas is bled off until moment of ending of injection and forcing of oil-emulsion slurry. Well is killed. Excessive grouting slurry is washed out. Cement sleeve is removed from flow string. Sump is cleaned. Setting of grouting slurry is waited for. Well is completed. EFFECT: higher efficiency and reliability of recovery of bottom-hole formation zone with simultaneous shutoff of water inflow to casing-string - borehole annulus with preserved reservoir properties of formation. 2 cl, 4 dwg

Similar patents RU2183724C2

Title Year Author Number
METHOD OF STABILIZATION OF BOTTOM-HOLE PRODUCING FORMATION ZONES 1999
  • Mosienko V.G.
  • Gasumov Ramiz Alidzhavad Ogly
  • Nersesov S.V.
  • Ostapov O.S.
  • Minlikaev V.Z.
RU2172811C2
METHOD OF WELL STAGE CEMENTING UNDER CONDITIONS OF ABNORMALLY LOW FORMATION PRESSURES IN LOST CIRCULATION ZONE 2000
  • Nersesov S.V.
  • Mosienko V.G.
  • Gasumov Ramiz Alidzhavad Ogly
  • Klimanov A.V.
  • Ostapov O.S.
  • Minlikaev V.Z.
  • Chernukhin V.I.
RU2188302C2
METHOD OF INSTALLATION OF CEMENT BRIDGE 1999
  • Dubenko V.E.
  • Andrianov N.I.
  • Shamshin V.I.
  • Gejkhman M.G.
RU2170334C2
TREATMENT METHOD FOR BOTTOMHOLE AREA OF TERRIGENOUS BED OF GAS WELL UNDER ABNORMAL LOW PRESSURE 2003
  • Dolgov S.V.
  • Gasumov Ramiz Alidzhavad Ogly
  • Lipchanskaja T.A.
  • Zinov'Ev V.V.
  • Aksjutin O.E.
  • Kiselev V.V.
  • Belenko S.V.
RU2261323C1
TECHNOLOGY TO CLEAR HORIZONTAL WELL FROM SAND PLUG IN PROCESS OF OVERHAUL 1999
  • Tagirov K.M.
  • Gasumov Ramiz Alidzhavad Ogly
  • Serebrjakov E.P.
  • Minlikaev V.Z.
  • Varjagov S.A.
  • Nifantov V.I.
  • Kallaeva R.N.
RU2165007C2
COMPOSITION FOR SHUTOFF OF WATER INFLOWS TO WELL 2001
  • Gasumov R.A.
  • Nersesov S.V.
  • Mosienko V.G.
  • Krjukov O.V.
  • Ostapov O.S.
  • Ponomarenko M.N.
  • Klimanov A.V.
RU2209297C2
METHOD FOR STEPPED CEMENTATION OF WELL IN HIGHLY PENETRABLE GAS-SATURATED COLLECTORS 2003
  • Ponomarenko M.N.
  • Gasumov Ramiz Alidzhavad Ogly
  • Mosienko V.G.
  • Nersesov S.V.
  • Petjalin V.E.
  • Gaziev K.M.-Ja.
  • Ostapov O.S.
  • Klimanov A.V.
RU2241819C1
METHOD OF PRODUCING GAS-BEARING FORMATION DRILLING-IN 2000
  • Gasumov Ramiz Alidzhavad Ogly
  • Dimitriadi Ju.K.
  • Tagirova A.M.
  • Korshunova L.G.
RU2196869C2
METHOD FOR WELL CEMENTATION 2002
  • Gasumov Ramiz Alidzhavad Ogly
  • Klimanov A.V.
  • Mosienko V.G.
  • Nersesov S.V.
  • Ponomarenko M.N.
  • Petjalin V.E.
  • Krjukov O.V.
  • Chernukhin V.I.
RU2232258C2
METHOD FOR OPENING OF PRODUCTIVE GAS-BEARING BED BY DRILLING 1998
  • Tagirov K.M.
  • Gnoevykh A.N.
  • Nifantov V.I.
  • Dubenko V.E.
  • Dimitriadi Ju.K.
RU2148698C1

RU 2 183 724 C2

Authors

Tagirov K.M.

Dubenko V.E.

Andrianov N.I.

Zinov'Ev V.V.

Dates

2002-06-20Published

2000-07-04Filed