FIELD: mining industry. SUBSTANCE: according to method, development is carried out by chambers layer by layer from bottom upwards with blast winning of ore and with continuous enlarging pillars of ore over entire height of block. Pillars are covered with isolating material. Working of pillars is performed by periodic blasting of their base from specially driven entries with delivery of broken ore mass to ore chutes. Space created after working-out of ore pillars are packed with filler. EFFECT: higher efficiency. 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DEVELOPING THICK ORE DEPOSITS BY UNDERGROUND MINING WITH INTERCHAMBER PILLARS SUPPORT | 2009 |
|
RU2405109C1 |
METHOD OF DEVELOPING THICK STEEPLY DIPPING ORE BODIES | 2014 |
|
RU2558841C1 |
METHOD OF UNDERGROUND SOLID MINERAL DEPOSIT MINING | 2004 |
|
RU2277171C1 |
METHOD FOR MINING INCLINED ORE DEPOSITS | 0 |
|
SU1789025A3 |
METHOD FOR MINING OF STEEPLY DIPPING ORE BODIES AND METHODS FOR MINING, PROCESSING AND CONCENTRATION OF COPPER, AND/OR COPPER-ZINC, AND/OR ZINC, AND/OR SULFUR ORES WITH POSSIBLE CONTENT OF GOLD, SILVER AND OTHER PRECIOUS AND RARE-EARTH ELEMENTS FROM STEEPLY DIPPING ORE BODIES | 1995 |
|
RU2053364C1 |
METHOD FOR EXPLOITATION OF STEEPLY DIPPING ORE BODIES AND METHODS FOR MINING, PROCESSING AND BENEFICIATION OF COPPER AND/OR COPPER/ZINC, AND/OR ZINC, AND/OR SULFUR ORES POSSIBLY CONTAINING GOLD, SILVER AND OTHER PRECIOUS AND RARE-EARTH ELEMENTS OF STEEPLY DIPPING ORE BODIES | 1995 |
|
RU2065053C1 |
DEVELOPMENT METHOD OF THICK STEEPLY DIPPING ORE BODIES | 2012 |
|
RU2502872C1 |
METHOD OF WORKING STEEPLY SLOPING MEDIUM-THICK ORE BODIES | 0 |
|
SU1078072A1 |
LAYERED ROOM-AND-PILLAR SYSTEM WITH COMPLETE STOWING | 2011 |
|
RU2486340C2 |
METHOD TO MINE THICK STEEP DEPOSITS OF UNSTABLE ORE | 2016 |
|
RU2648371C1 |
Authors
Dates
2000-05-10—Published
1992-10-22—Filed