FIELD: mining and underground building, particularly underground mining.
SUBSTANCE: method involves double-stage mineral deposit development; erecting artificial rock-and-concrete supports of previously cut primary chamber roof rock in at least two adjacent primary chambers; extracting secondary chamber resources; filling space defined by cut rock with hardening material mix. Mines for drilling and/or filling operations performing are arranged in deposit roof over or inside ore pillars of secondary chambers. Primary chamber roof rock is cut by well undercharge method. Hardening material mix is supplied via cross headings located between mine and cavities and/or via undercharged well sections remained after rock cutting operation.
EFFECT: increased safety and economical efficiency due to reduced number of drilling and filling mines or accompanying mineral excavation, possibility to use drilling and filling mines at secondary chamber development stage for ore cutting, venting and roof condition control.
5 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF UNDERGROUND MINING OF STEEP FIELD OF FIRM MINERAL | 2007 |
|
RU2334875C1 |
ORE BODY MINING METHOD | 2009 |
|
RU2424432C1 |
UNDERGROUND DEVELOPMENT METHOD OF SERIES OF THIN STEEP DEPOSITS | 2009 |
|
RU2425218C1 |
METHOD OF MINING THICK ORE DEPOSITS | 0 |
|
SU1028847A1 |
METHOD FOR WORKING THICK ORE DEPOSITS | 0 |
|
SU901529A1 |
METHOD OF WORKING UNSTABLE ORE BODIES | 0 |
|
SU905466A1 |
MINING METHOD OF THIN FLAT ORE BODY | 2010 |
|
RU2456452C2 |
METHOD FOR EXTRACTION OF STEEP-FALLING DEPOSITS OF WEAK ORES | 2003 |
|
RU2248448C1 |
UNDERGROUND MINERAL MINING METHOD | 2005 |
|
RU2306417C2 |
METHOD OF DEVELOPING THICK ORE DEPOSITS BY UNDERGROUND MINING WITH INTERCHAMBER PILLARS SUPPORT | 2009 |
|
RU2405109C1 |
Authors
Dates
2006-05-27—Published
2004-11-09—Filed