FIELD: oil and gas production. SUBSTANCE: when developing recently drilled well, bottom zone of well is simultaneously affected by chemically active fluid and hydraulic pulses. For that, interval of productive formation in well is filled with solution for treatment of bottom zone. Hole clearance of well is cut off and vacuum-pulse action is conducted at reduced intensity, while simultaneously pumping off reaction products. In pauses between vacuum-pulse action series, well bottom is subjected to jet action. The two action are made by means of step piston connected with bar string. Vacuum-pulse action is performed during upward motion of bar string and step piston, and jet action during downward motion. EFFECT: enhanced well development efficiency. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
IMMERSIBLE SUCKER ROD PUMP | 1998 |
|
RU2136964C1 |
METHOD OF DEVELOPING WELL OIL RESERVOIR WITH HORIZONTAL TERMINATION | 2015 |
|
RU2590918C1 |
WELL OPERATION METHOD | 2006 |
|
RU2295633C1 |
PROCEDURE FOR DEVELOPMENT OF OIL DEPOSIT | 2010 |
|
RU2417306C1 |
WELL CLEANING METHOD | 2011 |
|
RU2451159C1 |
METHOD OF WELL BOTTOMHOLE TREATMENT AND OIL RECOVERY | 2007 |
|
RU2336412C1 |
DEVICE FOR WELL CLEAN-UP | 2011 |
|
RU2447261C1 |
WELL OPERATION METHOD | 2010 |
|
RU2425961C1 |
WELL SWABBING METHOD | 2010 |
|
RU2410532C1 |
WELL COMPLETION METHOD | 2014 |
|
RU2541988C1 |
Authors
Dates
2000-06-27—Published
1999-12-03—Filed