FIELD: oil and gas production. SUBSTANCE: mud acid solution is injected into formation at pressure superior to formation breakdown pressure while gradually reducing pumping pressure. Before and after injection of acid mud at indicated pressure, fresh water is injected while likewise gradually reducing pumping pressure. When mud acid and fresh water are injected, well is closed until pressure reduces and acid reaction is completed. EFFECT: enhanced formation breakdown efficiency.
Title | Year | Author | Number |
---|---|---|---|
METHOD OF OIL FORMATION HYDRAULIC FRACTURING | 2000 |
|
RU2156356C1 |
METHOD OF TREATMENT OF WELL BOTTOM-HOLE ZONE | 2002 |
|
RU2206732C1 |
METHOD FOR PERFORMING PULSE HYDRAULIC FRACTURING OF CARBONATE FORMATION | 2011 |
|
RU2460876C1 |
FORMATION HYDRAULIC FRACTURING METHOD | 2014 |
|
RU2563901C1 |
INTENSIFICATION METHOD FOR WELL OPERATION | 2019 |
|
RU2720717C1 |
METHOD OF INTENSIFICATION OF WELL OPERATION AFTER ITS CONSTRUCTION | 2019 |
|
RU2705643C1 |
CARBONATE FORMATION HYDRAULIC FRACTURING METHOD | 2013 |
|
RU2509883C1 |
ACID TREATMENT METHOD OF PRODUCTIVE FORMATION | 2019 |
|
RU2728401C1 |
CARBONACEOUS OIL DEPOSIT DEVELOPMENT METHOD | 2014 |
|
RU2544931C1 |
METHOD OF BENCH TREATMENT | 2009 |
|
RU2401381C1 |
Authors
Dates
2000-06-27—Published
1999-12-27—Filed