FIELD: oil and gas production. SUBSTANCE: in the course of development of oil pool with cavernous fractured reservoir, vertical and of horizontal wells are led. Oil is taken away from producing wells and working agent is injected through injection wells. When developing oil pool with cavernous fractured reservoir with horizontal cavernosity, horizontal well in productive bed is led below or above horizontal cavernosity. From of horizontal hole, perforation of bed, its hydraulic fracturing, or drilling of vertical holes to horizontal cavernosity zone are performed. EFFECT: increased oil recovery. 3 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD OF LOW-PERMEABLE OIL DEPOSIT DEVELOPMENT | 2013 |
|
RU2526937C1 |
DEVELOPMENT OF LOW-PERMEABILITY OIL DEPOSITS BY HORIZONTAL WELLS UNDER NATURAL CONDITIONS | 2013 |
|
RU2528757C1 |
DEVELOPMENT OF LOW-PERMEABILITY OIL POOLS BY HORIZONTAL WELLS WITH MAINTENANCE OF SEAM PRESSURE | 2013 |
|
RU2526430C1 |
METHOD OF OIL POOL DEVELOPMENT | 2012 |
|
RU2514046C1 |
OIL DEPOSIT DEVELOPMENT METHOD | 2013 |
|
RU2513390C1 |
OIL DEPOSIT DEVELOPMENT METHOD | 2013 |
|
RU2513216C1 |
DEVELOPMENT METHOD OF HETEROGENOUS OIL-BEARING FORMATION | 2008 |
|
RU2364717C1 |
RECOVERY METHOD OF SHALE CARBONATE OIL FIELD | 2016 |
|
RU2612061C1 |
METHOD FOR EXTRACTION OF OIL DEPOSIT WITH NON-HOMOGENOUS COLLECTOR | 2004 |
|
RU2256070C1 |
OIL DEPOSIT DEVELOPMENT METHOD | 2011 |
|
RU2459938C1 |
Authors
Dates
2000-07-20—Published
2000-01-11—Filed