FIELD: oil-and-gas industry.
SUBSTANCE: invention relates to petroleum industry and can be used at development of heterogenous oil-bearing formation. According to the method it is placed in bunch extractive and injection wells by seven-spot flooding system with central injection well. There are drilled boreholes of multi- bottomhole producers. It is pumped working substance through the injection wells and oil is extracted through producers. Boreholes of multi- bottomhole producers are placed on-the-mitre more than 200 to the direction of natural fracture. Distance from central injection well up to entry point into stratum of multi- bottomhole producer, located from central injection well in the direction of natural fracture, it is installed for 10-20% more, than distance from ocentral injection well up to point-of-entry into stratum of multi- bottomhole producer, located from central injection well perpendicularly to the direction of natural fracture.
EFFECT: increasing of deposit's oil recovery.
1 ex, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVELOPMENT METHOD OF OIL DEPOSIT WITH HORIZONTALLY BRANCHED WELLS | 2014 |
|
RU2569521C1 |
OIL DEPOSIT DEVELOPMENT METHOD | 2013 |
|
RU2513216C1 |
OIL DEPOSIT DEVELOPMENT METHOD | 2013 |
|
RU2513962C1 |
METHOD OF DEVELOPMENT OF OIL DEPOSITS | 2014 |
|
RU2569520C1 |
OIL DEPOSIT DEVELOPMENT METHOD | 2016 |
|
RU2635926C2 |
METHOD FOR EXTRACTING OIL DEPOSIT WITH CARBONATE MANIFOLDS OF LOW PRODUCTIVENESS | 2002 |
|
RU2227207C2 |
METHOD OF DEVELOPING DEPOSIT WITH FRACTURED RESERVOIRS | 2015 |
|
RU2595106C1 |
METHOD OF OIL RESERVOIR DEVELOPMENT BY WELLS WITH HORIZONTAL END | 2014 |
|
RU2569514C1 |
OIL DEPOSIT DEVELOPMENT METHOD | 2014 |
|
RU2556094C1 |
METHOD OF OIL POOL DEVELOPMENT | 2013 |
|
RU2519953C1 |
Authors
Dates
2009-08-20—Published
2008-10-15—Filed