FIELD: nuclear industry; water-cooled power reactors. SUBSTANCE: process line has fuel-element cladding preparation unit, vibratory unit for charging pile of fuel pellets through open end of cladding, device for cleaning off open end of charged cladding, unit for press-fitting locks into open end of charged cladding, sealing unit for open end of charged cladding, check-up and rejecting mechanism responding to pressure within fuel element cladding; fuel-element surface treatment unit that also provides for oxidizing cladding surface. Trimming mechanisms for fitting tubes to fuel- element cladding size for nuclear reactor VVER-1000 are mounted for relative displacement towards each other through distance ensuring trimming of tube to size of cladding for reactor VVER-440. Axially movable stop of mechanism checking the length of tubular cladding for fuel element of reactor VVER-1000 is provided with removable extension piece that functions to check length of tubular cladding for fuel element of reactor VVER-440. Cladding end calibration mechanism for fuel element of reactor VVER-1000 is equipped with removable extension piece to provide for calibrating one end of cladding for fuel element of reactor VVER-440 that incorporates cladding ramrod. Mechanism for press-fitting plug into calibrated end of cladding for fuel element of VVER-1000 is fitted with removable hollow rod whose interior follows outlines of plug for fuel element of VVER-440 which is coaxial with center line of cladding for fuel element of VVER-440. EFFECT: enlarged functional capabilities and improved yield of fuel elements. 3 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCESS LINE FOR FUEL ELEMENT MANUFACTURE | 2003 |
|
RU2256250C2 |
PROCESS LINE FOR MANUFACTURING FUEL ELEMENTS | 2001 |
|
RU2216801C2 |
AUTOMATIC MANUFACTURING LINE OF FUEL ELEMENTS OF NUCLEAR REACTOR | 2010 |
|
RU2459292C1 |
PROCESS LINE FOR MANUFACTURING FUEL ELEMENTS | 2002 |
|
RU2248054C2 |
PROCESS LINE FOR MANUFACTURING FUEL ASSEMBLIES | 2002 |
|
RU2231835C2 |
PROCESS LINE FOR MANUFACTURING FUEL ELEMENTS AND INSPECTING THEM FOR QUALITY | 2001 |
|
RU2216058C2 |
PROCESS LINE FOR MANUFACTURING FUEL ELEMENTS | 1997 |
|
RU2145449C1 |
PROCESS LINE FOR MANUFACTURING FUEL ELEMENTS | 2002 |
|
RU2231836C2 |
PROCESS LINE FOR FUEL ROD MANUFACTURE AND NUCLEAR POWER REACTOR FUEL ROD | 2001 |
|
RU2216797C2 |
METHOD FOR CHARGING AND REJECTING FUEL ELEMENTS | 2000 |
|
RU2195718C2 |
Authors
Dates
2000-08-27—Published
1999-02-17—Filed