FIELD: construction engineering; construction of buildings and structures of high seismic activity. SUBSTANCE: slots made on bed surfaces of building brick made in the form of rectangular parallelepiped are contracting towards external bed surfaces of brick. Ratio of smaller size a to larger one d of slot should be 0,5 to 0,7. Slot depth h satisfies condition a≤h<d. Slot-to-slot distance c should equal at least greater size of slot c≥d. Slots may be of segmental, trapezoidal, or elliptical section. EFFECT: improved strength of brickwork concerning its axial tension along non-bonded joints. 4 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
BUILDING BRICK | 2000 |
|
RU2184194C1 |
BUILDING BLOCK (EMBODIMENTS) | 2018 |
|
RU2688696C2 |
CONSTRUCTION BLOCK AND METHOD TO ERECT STRETCHER BOND FROM THIS CONSTRUCTION BLOCK | 2013 |
|
RU2525243C1 |
INSERTS FOR MASONRY MORTAR, ERECTION METHOD OF WALL BLOCKWORK (VERSIONS) USING THESE INSERTS AND MASONRY MORTAR FOR ERECTION OF WALL BLOCKWORK (VERSIONS) | 2014 |
|
RU2562638C1 |
METHOD FOR HIGH-SPEED CONSTRUCTION OF BUILDINGS | 2015 |
|
RU2583801C1 |
CONSTRUCTION METHOD OF STRETCHER MASONRY OF BUILDING BLOCKS (VERSIONS) | 2013 |
|
RU2607844C2 |
CELLULAR-POROUS CERAMIC BLOCK TO ERECT SINGLE-LAYER AND MULTI-LAYER WALLS | 2011 |
|
RU2466246C1 |
BUILDING MEMBER FOR WALL ERECTION AND BUILDING MEMBER LAYING METHOD | 2006 |
|
RU2304674C1 |
FACING HOLLOW-POROUS CERAMIC UNIT | 2012 |
|
RU2522562C1 |
METHOD TO ERECT STRETCHER BOND FROM CONSTRUCTION BLOCKS | 2013 |
|
RU2529534C1 |
Authors
Dates
2000-09-27—Published
1998-12-30—Filed