FIELD: oil industry, conducting of perforation operations in production wells. SUBSTANCE: shaped charges are installed and anchored in tube of perforator in correspondence with invention. They are interconnected by means of detonation cord and are linked to initiation unit. Electric communication line from initiation unit to electric lead-in in head of perforator is laid. Tube is shut by head on top and by lug from beneath. Internal space of tube is vacuumed through hole in nipple which is placed in lug before assembly. When nipple shuts automatically after termination of vacuuming process hole with nipple is sealed additionally. EFFECT: increased perforation efficiency. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR INITIATION OF DETONATION IN PERFORATORS LOWERED INTO WELL ON TUBINGS | 1998 |
|
RU2160829C2 |
BOREHOLE HOLLOW-CARRIER JET-TYPE PERFORATOR | 2004 |
|
RU2270911C1 |
DEVICE FOR REPAIR OF OIL AND GAS WELLS | 1997 |
|
RU2134769C1 |
INTER-SECTION UNIT FOR RECEIPT-TRANSMISSION OF HOLLOW-CARRIER JET-GUN DETONATION | 2009 |
|
RU2402676C1 |
DEVICE FOR DETONATION INITIATION IN BOREHOLE PERFORATOR | 2004 |
|
RU2272895C1 |
METHOD AND DEVICE FOR CUMULATIVE OIL WELL PERFORATION (VARIANTS) | 2004 |
|
RU2275496C2 |
JET-CHARGE PERFORATOR | 1999 |
|
RU2160828C2 |
DETONATING DEVICE OF MECHANICAL FUSE | 2004 |
|
RU2272983C1 |
PROBE FOR ELECTRIC LOGGING | 1993 |
|
RU2070333C1 |
METHOD FOR RESERVOIR PENETRATION AND TREATMENT | 2005 |
|
RU2312982C2 |
Authors
Dates
2000-09-27—Published
1998-12-30—Filed