FIELD: oil industry, particularly methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells.
SUBSTANCE: device comprises instrument head, triggering mechanism, cased cumulative perforator provided with mechanical or adiabatic detonator without primers, and charges having penetration capability up to 700 mm and inlet hole diameter of 8-26 mm, one or two depression chambers with valves for chamber opening. Valves have diameters of 10-65 mm. Electrohydraulic triggering mechanism is used as the triggering mechanism. After triggering mechanism opening upper receiving valve and lower valve, namely depression chamber striker, may be opened to provide depression chamber opening and depression creation in well along with simultaneous cumulative perforator fuse initiation to create perforation channels during reduced formation pressure period and with forming repression hydroblow action to provide hydraulic fracturing of formation with following depression-repression perforated interval treatment. When two depression chambers are used the second chamber is chamber having automatic time-delay valve. Device in accordance with the second embodiment is not provided with depression chambers. Method involves installing device in design perforation interval; actuating explosion charges and creating perforation channels. In accordance with the first embodiment time-controlled and value-controlled depression is created to provide repression hydraulic formation fracturing along with single-stage or double-stage high-cycle hydroblow action by using device having one or two depression chambers. In accordance with the second embodiment device without depression chambers is used.
EFFECT: increased efficiency of secondary productive formation penetration.
5 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD AND DEVICE FOR OIL AND GAS WELL OPERATION INTENSIFICATION (VERSIONS) | 2012 |
|
RU2495999C1 |
METHOD AND DEVICE FOR STIMULATING OIL AND GAS WELLS OPERATION (VERSIONS) | 2007 |
|
RU2352770C2 |
GEAR AND TECHNOLOGY OF REPEAT OPENING OF PRODUCTIVE POOLS | 2000 |
|
RU2183259C2 |
DEVICE AND METHOD OF THERMO-GAS-HYDRO-DEPRESSION WAVE FRACTURING OF PRODUCTIVE FORMATIONS FOR DEVELOPMENT OF HARD-TO-RECOVER RESERVES (VERSIONS) | 2015 |
|
RU2592910C1 |
DEVICE AND METHOD FOR THERMAL GAS-HYDRODYNAMIC OIL AND GAS FORMATION FRACTURE (VERSIONS) | 2012 |
|
RU2493352C1 |
METHOD AND DEVICE FOR GAS-HYDRODYNAMIC FRACTURING OF PRODUCTIVE FORMATIONS FOR DEVELOPMENT OF PROBLEMATIC RESERVES (VARIANTS) | 2010 |
|
RU2442887C1 |
METHOD OF MULTICYCLE PULSE STIMULATION OF FORMATION WITH CLEANING OF BOTTOM-HOLE FORMATION ZONE | 1997 |
|
RU2136874C1 |
IMPLOSATOR | 2008 |
|
RU2384695C2 |
METHOD OF PERFORATION OF PRODUCING FORMATIONS IN OIL AND GAS WELLS UNDER DRAWDOWN | 1999 |
|
RU2171367C2 |
DEVICE AND METHOD OF WELL HYDRODYNAMIC INVESTIGATIONS AND TESTS | 2001 |
|
RU2199009C2 |
Authors
Dates
2006-04-27—Published
2004-07-22—Filed