FIELD: oil production industry, working of oil and oil and gas fields including several horizons of collectors of various types. SUBSTANCE: optimum seam pressure for extraction of products from each productive horizon is determined before start of working of oil field. Base horizon carrying maximum stock of oil is selected. Then production wells are set in operation under optimum seam pressure for base horizon. Seam pressures in production wells for the rest of horizons are determined by seam pressure in base horizon and are computed with correction for hydraulic coupling between them over shaft of well. EFFECT: reduced operational expenses, increased current extraction of oil, raised coefficient of extraction and enhanced oil output in case of joint working of several horizons. 5 dwg, 4 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR EXPLORATION OF MULTI-SEAM OIL DEPOSIT WITH RESERVOIRS OF DIFFERENT STRUCTURE TYPE | 1993 |
|
RU2072031C1 |
METHOD TO DETERMINE PERMEABILITY AND POROSITY OF OIL-SATURATED RESERVOIRS | 2006 |
|
RU2320869C1 |
METHOD FOR CONTROLLING EXTRACTION OF OIL DEPOSIT | 2003 |
|
RU2254455C1 |
METHOD FOR SMALL OR MEDIUM-SIZE OIL OR GAS DEPOSIT DEVELOPMENT | 2007 |
|
RU2313662C1 |
METHOD OF DEVELOPING OIL OR OIL-GAS CONDENSATE MINEFIELDS AT LATE STAGE | 2008 |
|
RU2346148C1 |
METHOD FOR DEVELOPMENT OF OIL AND GAS DEPOSITS | 1997 |
|
RU2112868C1 |
METHOD OF DEVELOPING OIL DEPOSITS WITH ELEVATED-VISCOSITY OILS | 1998 |
|
RU2132937C1 |
METHOD OF DEVELOPMENT OF OIL FIELD WITH NONUNIFORM RESERVOIRS AND DIFFICULTLY RECOVERABLE OIL RESERVES | 2002 |
|
RU2215128C1 |
METHOD OF ADDITIONAL DEVELOPMENT OF WATER-FLOODED SECTIONS OF GAS-CONDENSATE DEPOSIT OF OIL AND GAS CONDENSATE DEPOSIT | 2019 |
|
RU2744535C1 |
METHOD AND EQUIPMENT TO OPERATE TWO FORMATIONS IN SINGLE WELL | 2004 |
|
RU2296212C2 |
Authors
Dates
2000-12-10—Published
1999-02-23—Filed