FIELD: medicine. SUBSTANCE: device has beam structure protruding from artificial tooth and being supporting member which middle part is fixed inside of the artificial tooth. The beam structure ends protruding on both sides are arranged on a line corresponding to the shape of the substituted dental row part at the level of fixation. The beam structure ends correspond in shape, size and orientation to the like parameters of the anchor teeth to be strengthened therewith. Method involves forming cavities for placing supporting members of an artificial tooth to be fixed with adhesive material hardening under light action. When producing cavity in the anchor teeth, some requirements like age safety zones, permissible crown height not to be higher than 6 mm are to be satisfied as well as the cavity areas in both anchor teeth not to be less than 50% of the corresponding anchor teeth area at the level of supporting member fixation. EFFECT: enhanced effectiveness of treatment; stable hypotensive effect; lower risk of complications. 2 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR SUBSTITUTING FAILING FRONTAL TOOTH WITH REINFORCING NET-AND-BEAM ADHESIVE DENTAL BRIDGE | 2004 |
|
RU2269322C1 |
METHOD FOR SUBSTITUTING FAILING ANTERIOR TOOTH WITH REINFORCING ADHESIVE NET BRIDGE PROSTHESIS BEING APPLIED | 2004 |
|
RU2261685C1 |
METHOD FOR SUBSTITUTING FAILING FORETOOTH WITH COMBINED REINFORCED ADHESIVE BRIDGE PROSTHESIS FROM TITANIUM OR TITANIUM NICKELIDE | 2004 |
|
RU2262907C1 |
METHOD FOR SUBSTITUTING TWO LATERAL TEETH BY APPLYING REINFORCING ADHESIVE NET-BEAM BRIDGE PROSTHESIS | 2004 |
|
RU2261686C1 |
METHOD FOR REPAIRING DENTAL ROW HAVING TWO FAILING LATERAL TEETH AND COMPLETELY OR PARTIALLY FAILING CROWN PARTS OF SUPPORTING TEETH BY APPLYING REINFORCING NET-BEAM BRIDGE PROSTHESIS | 2004 |
|
RU2261687C1 |
DEVICE FOR FIXING CLASP DENTURE | 2002 |
|
RU2206292C1 |
METHOD OF MANUFACTURING OF REINFORCING ADHESIVE BEAM- ARCH BRIDGE PROSTHESIS IN LATERAL TEETH REPLACEMENT | 2007 |
|
RU2345734C1 |
METHOD FOR MANUFACTURING DENTAL BRIDGE | 1998 |
|
RU2181577C2 |
METHOD OF HORIZONTAL MOTION OF TEETH WITH INCLUDED DENTAL DEFECTS | 2018 |
|
RU2679591C1 |
MILLED BITE SPLINT | 2016 |
|
RU2632755C1 |
Authors
Dates
2000-12-20—Published
1999-03-23—Filed