FIELD: construction. SUBSTANCE: method consists in erection of foundation and attachment of pre-bent reinforcing members to it forming a rigid net. A layer of warmth-keeping lagging is laid on top the net, and unit is applied first to the inner surface of the building and then to the outer one. EFFECT: erection of buildings of various shape. 9 cl, 36 dwg
| Title | Year | Author | Number |
|---|---|---|---|
| MONOLITHIC BUILDING | 1993 |
|
RU2032032C1 |
| WALL STRUCTURE | 2023 |
|
RU2817846C1 |
| METHOD OF ERECTION OF FERROCONCRETE SPHERICAL VAULTS | 2001 |
|
RU2213835C2 |
| FOUNDATION OF PILES AND SHELLS | 2010 |
|
RU2447230C1 |
| ARCH AND RING BUILDING AND METHOD FOR THE ERECTION THEREOF | 2021 |
|
RU2779953C1 |
| SPHERICAL SPATIAL STRUCTURE | 2012 |
|
RU2533946C2 |
| DOUBLE-WALLED VAULTED BUILDING STRUCTURE ERECTION METHOD | 2003 |
|
RU2261959C2 |
| METHOD OF SHALLOW STRIP FOUNDATION REINFORCEMENT | 2011 |
|
RU2447232C1 |
| TALL BUILDING | 2007 |
|
RU2350717C1 |
| METHOD OF ASSEMBLY OF SPHERICAL SPATIAL STRUCTURE | 2012 |
|
RU2528759C2 |
Authors
Dates
2000-12-27—Published
2000-06-29—Filed