FIELD: construction engineering. SUBSTANCE: method includes filling with air up to working pressure of pneumatic forms made of flexible forming members; installation of framework members; laying and fastening of reinforcing fabric to pneumatic forms with subsequent concrete spraying to form spherical vault; holding of spherical vault until concrete setting; dismantling of pneumatic forms. Novelty consists in that, first, framework members are installed then, pneumatic forms are preliminarily filled with air up to obtaining rated geometrical shape of spherical vault, and woven wire fabric is fastened between framework members, pneumatic forms are filled up to working pressure with subsequent laying and fastening of reinforcing fabric on surface of woven wire fabric. EFFECT: simplified technology of erection of ferroconcrete spherical vaults. 4 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD TO ERECT DOME ROOF OF RELIGIOUS BUILDING | 2010 |
|
RU2439254C1 |
PRE-FABRICATED HANGAR BASED ON PNEUMATIC FORMWORK | 2020 |
|
RU2747998C1 |
METHOD OF ERECTION OF SHELLS ON PNEUMATIC FALSEWORK | 1994 |
|
RU2112120C1 |
METHOD TO ERECT SUPPORT OF AERIAL CABLEWAY | 2011 |
|
RU2459908C1 |
METHOD OF CONCRETING ON PNEUMATIC FALSE WORK AND DEVICE FOR ITS REALISATION | 2007 |
|
RU2346123C1 |
FLOOR FOR BUILDING AND BUILDING STRUCTURES | 2005 |
|
RU2298617C2 |
THREE-ARCHED UNDERGROUND STATION OF COLUMN TYPE AND ITS ERECTION METHODS (YURKEVICH DEVICE AND METHODS) | 2012 |
|
RU2510444C2 |
JOINT METHOD TO CONNECT BRIDGE SPAN STRUCTURE BLOCKS | 2004 |
|
RU2284388C2 |
METHOD TO ERECT CROSS VAULT | 2008 |
|
RU2419708C2 |
METHOD OF PRELIMINARY TENSED CONSTRUCTION FRAME AND CASING ERECTION | 2006 |
|
RU2328579C1 |
Authors
Dates
2003-10-10—Published
2001-08-09—Filed