FIELD: mining industry, applicable for blasting of rocks at exploitation of mineral resources or construction of objects of various designation. SUBSTANCE: the method consists in placement of a detonating cord of the main and duplicating networks in the charge hole and in the lines along series of charges of multi-row short-delay blasting with a subsequent feed of the initial impulse through the detonating cord, prior to placement, the detonating cord of the main and duplicating networks get twisted. The turning pitch of two threads of the detonating cord is within 0.5 to 0.25 m. EFFECT: enhanced power and reliability of transmission of the initiating impulse to the deep-hole charges, reduced quantity of their failures and enhanced efficiency of rock blasting. 1 tbl, 2 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR INITIATION OF DEEP-HOLE EXPLOSIVE CHARGES | 1989 |
|
RU2138771C1 |
METHOD FOR INITIATION OF DEEP-HOLE EXPLOSIVE CHARGES | 2000 |
|
RU2169899C1 |
METHOD FOR CONDUCTING OF DRILLING AND BLASTING OPERATIONS | 2004 |
|
RU2290597C2 |
EXPLOSIVE CHARGE INITIATION SYSTEM | 2005 |
|
RU2285897C1 |
METHOD FOR INSTALLATION OF BLASTING NETWORK FOR CRUSHING OF DIFFICULTY EXPLOITABLE ROCKS | 1998 |
|
RU2150673C1 |
METHOD FOR SHOOTING OF ORE FROM MASSIF WITH FLAKY TEXTURE | 2008 |
|
RU2379622C1 |
METHOD FOR CHARGE INITIATION | 1989 |
|
SU1840798A1 |
METHOD FOR BLASTING OF DEEP-HOLE CHARGES | 2003 |
|
RU2234052C1 |
METHOD OF PROTECTING ENVIRONMENT AGAINST DUST AND GAS CLOUD AT BLAST WORK IN OPEN MINES | 0 |
|
SU1693263A1 |
METHOD OF BREAKING UP BY EXPLOSIVES ORE FROM SOLID MASS WITH LAYERED TEXTURE | 2013 |
|
RU2532478C1 |
Authors
Dates
2001-03-27—Published
1999-05-12—Filed