FIELD: oil and gas industry. SUBSTANCE: invention specifically refers to secondary perforation of productive levels by formation of perforation conduits in operational string and face zone of oil- and gas-saturated pool. It can be used in construction of wells of various assignment. In correspondence with process perforator is sunk into well. Casing string is perforated in interval of oil-and gas-saturated pool. System of cruciform, radial conduits is formed over height of pool at distance of 0.5-1.0 m one from another with extent up to 3.0 m. Each system of conduits is displaced with reference to preceding system through 10-35 degrees. EFFECT: increased efficiency and quality of secondary perforation of oil-and gas-saturated pools. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR MAKING PERFORATION SLITS IN OPERATION COLUMN AND METHOD FOR OPENING BEDS | 2003 |
|
RU2256066C2 |
METHOD OF STABILISATION OF PRODUCING FORMATION WITH UNSTABLE ROCKS | 2011 |
|
RU2464410C1 |
METHOD OF SECONDARY DRILLING-HELICOID PUNCHED | 2014 |
|
RU2576269C2 |
WELL COMPLETION METHOD AND DEVICE | 2001 |
|
RU2271441C2 |
WELL COMPLETION METHOD | 2013 |
|
RU2533783C1 |
WELL COMPLETION METHOD | 2023 |
|
RU2795281C1 |
WELL COMPLETION METHOD | 2005 |
|
RU2304697C1 |
METHOD FOR IMPROVING HYDRODYNAMIC CONNECTION WITH WELLS PRODUCING FORMATION | 2014 |
|
RU2580531C2 |
METHOD FOR COMPLETION OF WELL CONSTRUCTION | 0 |
|
SU1639120A1 |
PROCESS OF TERMINATION OF CONSTRUCTION OF WELLS AND GEAR FOR ITS IMPLEMENTATION | 2000 |
|
RU2165516C1 |
Authors
Dates
2001-04-20—Published
2000-03-29—Filed