FIELD: building structures; civil and industrial construction engineering. SUBSTANCE: construction unit may be used as bearing structure of mainly bent and compression-bent construction units (beams, purlins, etc.) made of wood. Metal sunk keys have side straps with holes to receive central bolts securing paired grapple clamps installed in inclined position relative to longitudinal axis of construction unit in compliance with shear thrust curves for fastening joints. EFFECT: reduced sectional area of fastening members and stress concentration at loose points. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR COMBINATION PRESTRESSING OF PERFORATED TRUSSED BEAM | 2001 |
|
RU2190735C1 |
DISMOUNTABLE-ASSEMBLED METAL-WOOD TRUSSED BEAM | 2001 |
|
RU2182207C1 |
METHOD FOR JOINING ELEMENTS OF COMPOSITE WOODEN STRUCTURES | 2021 |
|
RU2764127C1 |
PRESTRESSED TRUSSED GIRDER | 2001 |
|
RU2184819C1 |
PRE-STRESSED TRUSSED BEAM | 1999 |
|
RU2169243C1 |
PROCESS OF STRENGTHENING OF REINFORCED CONCRETE BEAM WITH STRUT FRAME | 2002 |
|
RU2208105C1 |
PROCESS OF REINFORCEMENT OF BEAM WITH PRESTRESSED STRUT FRAME | 2002 |
|
RU2209278C1 |
PRESTRESSED TRUSSED BEAM | 2001 |
|
RU2186913C1 |
TRUSSED BEAM | 1999 |
|
RU2169242C1 |
WAY OF REINFORCEMENT OF BEAM BY PRE-STRESSED STRUT FRAME | 2001 |
|
RU2187608C1 |
Authors
Dates
2001-04-27—Published
1999-07-14—Filed