FIELD: construction, applicable in manufacture of building metalworks, in particular, in prestressing of perforated trussed beams. SUBSTANCE: the method consists in installation of the members of the perforated stiffening beams obtained by zigzag cutting of the starting section with a variable height of corrugations, one above another with an engagement in their middle parts, then joining to one of members of the beam struts and tie bar, flexible bend of the members until the projecting edges of the corrugations come in contact with one another and their subsequent welding. After installation of the beam members one above another, rotary posts are connected to one of them with a shift of their ends with the guide locks towards its middle, and T-shaped rotary posts with attached loop-shaped yokes are installed slantwise on the end sections, they are set up in the C-shaped guides positioned on the ends sections of the other member of the perforated stiffening beam. After that, the tie bar provided with a tensioning device is fastened in the guide locks and connected to the ends of T-shaped rotary posts. Then, the tie bar is stressed by the tensioning device, bending thereby the members of the perforated stiffening bar until all the projecting edges of the corrugations come in contact with one another, they are welded, and the tie bar is subjected to after-stressing. EFFECT: reduced labor content of prestressing of perforated trussed beams and reduced specific consumption of materials. 2 cl, 7 dwg
Title | Year | Author | Number |
---|---|---|---|
WAY OF REINFORCEMENT OF BEAM BY PRE-STRESSED STRUT FRAME | 2001 |
|
RU2187608C1 |
PROCESS OF STRENGTHENING OF REINFORCED CONCRETE BEAM WITH STRUT FRAME | 2002 |
|
RU2208105C1 |
PRE-STRESSED TRUSSED BEAM | 1999 |
|
RU2169243C1 |
PRE-STRESSED CABLE-STAYED STRUCTURE | 1999 |
|
RU2173751C2 |
PRESTRESSED TRUSSED GIRDER | 2001 |
|
RU2184819C1 |
TRUSSED BEAM | 1999 |
|
RU2169242C1 |
PROCESS OF MOUNTING OF PRESTRESSED STRUTFRAMED BEAM | 2002 |
|
RU2208104C1 |
PROCESS OF REINFORCEMENT OF BEAM WITH PRESTRESSED STRUT FRAME | 2002 |
|
RU2209278C1 |
PRESTRESSED TRUSSED BEAM | 2001 |
|
RU2186913C1 |
PRESTRESSED TRUSSED GIRDER | 2001 |
|
RU2186914C1 |
Authors
Dates
2002-10-10—Published
2001-11-21—Filed