FIELD: oil producing industry; applicable in development of wells with increase of oil formation permeability due to removal of highly molecular and paraffin-hydrate accumulations from oil. SUBSTANCE: method includes installation of tubing shoe in well in interval of upper perforation holes. Tubing shoe is made in the form of plug from silumin alloy. Internal space of tubing is filled with granulated magnesium. Injected through tubing-casing annulus to bottom-hole formation zone is hydrocarbon solvent together with emulsifier in volume not less than volume of pores of treated colmatage zone and kept in formation for time required for reaction. Then rated volume of 15-% hydrochloric acid is injected to well through tubing-casing annulus. Upon completion of exothermic reaction of hydrochloric acid with granulated magnesium on well bottom, with open casing-wellbore annular space, injected into well is 11-% aqueous sodium bisulfate NaHSO4H2O and 5-% solution of sodium carbonate separated in tubing by displacement fluid, and then tube space is opened. As a result of exothermic reaction between magnesium and hydrochloric acid, temperature in wellbore rises by 100 C to ensure heating of well zone complicated with asphalt-resin-paraffin accumulation. Formation of considerable volume of gas in wellbore and their subsequent passage through casing-wellbore annulus and pipe space build up differential pressure exerted on formation to ensure removal from well zone of dissolved organic substances and intensive withdrawal from well of dissolved colmatage formation, spent solutions with increased fluid inflow. EFFECT: increased well production rate. 1 tbl, 1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD OF WELL REAGENT TREATMENT | 2000 |
|
RU2166626C1 |
METHOD FOR THERMO-CHEMICAL WELL BORE ZONE CLEANING | 2003 |
|
RU2268998C2 |
METHOD FOR TREATMENT OF WELL PERFORATED ZONE | 1992 |
|
RU2042801C1 |
METHOD OF OIL POOL DEVELOPMENT | 2001 |
|
RU2204016C1 |
METHOD FOR REMOVING SEDIMENTATIONS FROM INJECTION WELLS | 1995 |
|
RU2086760C1 |
METHOD OF DEVELOPMENT OF OIL POOL | 2001 |
|
RU2205947C1 |
METHOD OF DEVELOPMENT OF OIL POOL | 2001 |
|
RU2205948C1 |
METHOD FOR TREATMENT OF INJECTION WELL | 1992 |
|
RU2043492C1 |
METHOD FOR BOTTOMHOLE ZONE TREATMENT | 2012 |
|
RU2512222C1 |
METHOD FOR TREATMENT OF FORMATION | 1993 |
|
RU2053355C1 |
Authors
Dates
2001-05-20—Published
2000-08-29—Filed