FIELD: mining industry, mining of mineral resources. SUBSTANCE: proposed aggregate is made of high- pressure column, tips of hydraulic giant, attachments of hydraulic elevator of circular type, inlet chamber, pulp-lifting column coaxially mounted inside high-pressure column for axial movement thanks to lifting-adjusting mechanism which provides for adjustment of size of ring clearance between lower face of mixing chamber and circular attachment of hydraulic elevator. EFFECT: expanded functional capabilities due to control over parameters of head and ejection of hydraulic elevator. 2 dwg
| Title | Year | Author | Number | 
|---|---|---|---|
| DEVICE FOR HYDRAULIC BOREHOLE MINING OF MINERALS | 1995 | 
									
  | 
                RU2111359C1 | 
| METHOD OF BOREHOLE MINING OF MINERAL SALTS | 2000 | 
									
  | 
                RU2186208C2 | 
| BOREHOLE INSTALLATION FOR HYDRAULIC EXCAVATING | 2007 | 
									
  | 
                RU2361082C2 | 
| DEVICE FOR OPENING HOLES OF PRODUCTION STRING AND METHOD OF BOREHOLE PRODUCTION OF LOOSE AND WATERED MINERAL RESOURCES USING HORIZONTAL CHAMBERS | 2017 | 
									
  | 
                RU2662483C1 | 
| DEVICE FOR BORE-HOLE HYDRAULIC EXTRACTION OF MINERALS | 1997 | 
									
  | 
                RU2113591C1 | 
| PROCESS OF BOREHOLE HYDRAULICKING OF MINERALS AND AGGREGATE FOR ITS IMPLEMENTATION | 1997 | 
									
  | 
                RU2109949C1 | 
| SUCTION-TUBE DREDGER UNIT FOR MINERAL BOREHOLE MINING FROM PAYABLE BEDS WITH UNSTABLE ROOF | 1995 | 
									
  | 
                RU2111360C1 | 
| DEEP-WELL HYDRAULIC MONITOR UNIT | 0 | 
									
  | 
                SU1382959A1 | 
| METHOD FOR HYDRAULIC BOREHOLE MINING | 2016 | 
									
  | 
                RU2635928C1 | 
| HYDRAULIC DREDGE | 2002 | 
									
  | 
                RU2232895C1 | 
Authors
Dates
2001-06-27—Published
2000-01-06—Filed