FIELD: shipbuilding. SUBSTANCE: trimaran approaches cargo and hold gate is open, thus receiving cargo, after which gate is closed and water is pumped out. EFFECT: possibility of loading large- sized cargoes directly from water in hold of center hull of trimaran and unloading it when required. 6 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF LOADING/UNLOADING FLOATING CARGOES | 2000 |
|
RU2171199C1 |
METHOD OF LOADING/UNLOADING SHIPS BY DIRECT TRANSFER OF CARGOES FROM WATER TO HOLD AND VICE VERSA | 1998 |
|
RU2144883C1 |
ICE CARRIER "H' | 1999 |
|
RU2145290C1 |
TRANSPORT ICE CARRYING SHIP | 1998 |
|
RU2145562C1 |
METHOD OF TRANSPORTATION OF ICE BLOCKS BY ICE CARRIERS | 1998 |
|
RU2145561C1 |
ICE CARRYING TRIMARAN (VERSIONS) | 2000 |
|
RU2177431C2 |
ICE CARRYING TRIMARAN | 2000 |
|
RU2177429C2 |
ICE-CARRYING TRIMARAN | 2000 |
|
RU2177430C2 |
ICE-CARRYING TRIMARAN | 2000 |
|
RU2177433C2 |
TRIMARAN-ICE CARRIER | 2000 |
|
RU2177432C2 |
Authors
Dates
2001-07-27—Published
2000-02-25—Filed