FIELD: shipbuilding; construction of ships and their holds used for carrying ice bars and watercraft such as barge- containers barcons with cargoes inside them. SUBSTANCE: trimaran has center and side hulls with double-heat-insulated walls and shipboard power plants with steering gears arranged in all three hulls. Opening doors of fore fairings and loading compartments formed by movable fore gate and bulkheads of hold are arranged in fore portions of center and side hulls. Center hull may be loaded and unloaded with the doors of fore fairings closed; side hulls may be loaded and unloaded with doors of fore fairing of center hull closed. EFFECT: facilitated cargo handling procedure; low cost; enhanced safety of navigation. 7 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF LOADING LARGE-SIZED CARGOES FROM WATER SHIP'S HOLD AND UNLOADING THEM INTO WATER | 2000 |
|
RU2177435C1 |
ICE-CARRYING TRIMARAN | 2000 |
|
RU2177433C2 |
ICE CARRYING TRIMARAN (VERSIONS) | 2000 |
|
RU2177431C2 |
ICE-CARRYING TRIMARAN | 2000 |
|
RU2177430C2 |
ICE CARRYING TRIMARAN | 2000 |
|
RU2177429C2 |
TRIMARAN-ICE CARRIER | 2000 |
|
RU2177432C2 |
TRANSPORT TRIMARAN | 2000 |
|
RU2173650C1 |
TRANSPORT TRIMARAN | 2000 |
|
RU2177428C1 |
METHOD OF LOADING/UNLOADING FLOATING CARGOES | 2000 |
|
RU2171199C1 |
METHOD OF LOADING FLOATING CARGOES ON AND UNLOADING THEM FROM TRIMARAN BY RECEIVING THEM INTO AND DISCHARGING FROM HOLD | 2000 |
|
RU2171198C1 |
Authors
Dates
2001-12-27—Published
2000-08-10—Filed