FIELD: oil and gas production. SUBSTANCE: grouting mortar, containing polymer, liquid hydrocarbon solvent, cross-linking agent, and cement (filler), contains, in particular, wt parts: prepolymer FP-65-2 as polymer, 100; 5% calcium chloride solution as crosslinker, 2.1-3.15; grouting cement as filler, 15-20; hydrocarbon solvent, 100; and, additionally, hardening accelerator UP-606/2, 0.1-0.2. EFFECT: accelerated initial gelation of mortar at normal temperature.
Title | Year | Author | Number |
---|---|---|---|
WATERPROOFING POLYMER GROUTING MORTAR FOR OIL AND GAS WELLS | 2000 |
|
RU2180392C1 |
HYDROPHOBIC POLYMER GROUTING COMPOUND FOR OIL AND GAS WELLS | 1999 |
|
RU2164586C2 |
METHOD FOR WATER INFLUX ISOLATION IN HORIZONTAL PRODUCING WELL BORE | 2004 |
|
RU2286447C2 |
HYDROPHOBIC POLYMER BACKFILLING COMPOSITION FOR OIL AND GAS WELLS | 2010 |
|
RU2434040C1 |
METHOD FOR WATER INFLUX ISOLATION IN HORIZONTAL PRODUCING WELL BORES | 2004 |
|
RU2286448C2 |
GROUTING COMPOSITION FOR OIL AND GAS WELLS | 2004 |
|
RU2270228C1 |
POLYMER GROUTING MORTAR | 2000 |
|
RU2180037C1 |
GROUTING COMPOSITION FOR SHUTOFF OF WATER INFLOW TO WELL | 2001 |
|
RU2214501C2 |
METHOD FOR LIQUIDATING COMPLICATIONS IN WELLS | 2002 |
|
RU2241818C2 |
WATER-BEARING BED ISOLATION METHOD | 2005 |
|
RU2299308C2 |
Authors
Dates
2002-03-10—Published
2000-09-27—Filed