FIELD: mining, particularly, methods of construction of well for water, oil and gas recovery, as well as geotechnological wells. SUBSTANCE: method includes well drilling depth of formed cavity, lowering casing string and hydraulic giant equipment into drilled well; washing of rocks of producing horizon with lifting pulp to surface and formation of chamber. In this case, casing string is lowered through entire depth of well. Washing of rocks of producing horizon is carried out through slots made in casing string. After formation of chamber, casing string is lifted or broken up to level of chamber roof, and worked out space of chamber is filled with granulated material. EFFECT: increased taking capacity of formed cavity in equipment of producing wells and increased their service life. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCEDURE FORMING TECHNOLOGICAL SPACE IN UNSTABLE ROCKS OF PRODUCTIVE HORIZON | 2001 |
|
RU2180940C1 |
METHOD OF TAPPING OF PRODUCING FORMATION OF FLUID MINERAL | 2001 |
|
RU2180699C1 |
PROCESS OF UNDERWATER EXCAVATION OF GRAVEL AND SAND MIXTURE | 2001 |
|
RU2180399C1 |
MINING METHOD OF WATER-BEARING SAND-GRAVEL DEPOSITS | 2001 |
|
RU2186215C1 |
PROCESS OF HYDRAULIC MINING OF SOLID MINERAL RESOURCES THROUGH HOLES | 2001 |
|
RU2181160C1 |
PROCESS OF BOREHOLE HYDRAULICKING OF MINERALS AND AGGREGATE FOR ITS IMPLEMENTATION | 1997 |
|
RU2109949C1 |
METHOD FOR HYDRAULIC BORE-HOLE MINING OF MINERALS | 1995 |
|
RU2081324C1 |
METHOD OF MINING OF MINERAL DEPOSITS | 1996 |
|
RU2101503C1 |
PROCEDURE OF BOREHOLE HYDRAULIC EXTRACTION OF MINERALS | 2007 |
|
RU2361083C2 |
METHOD FOR BORE-HOLE EXTRACTION OF USEFUL MINERALS | 1995 |
|
RU2086768C1 |
Authors
Dates
2002-04-20—Published
2001-07-12—Filed