FIELD: oil industry, development of oil field constructed intricately. SUBSTANCE: in process of development of oil field oil is recovered through production wells and working fluid is pumped through injection wells. Direction of zone of maximum jointing formed in collector in process of well development is exposed. Direction of jointing being exposed fluid with indicator is injected and time of travel of indicator and volume of fluid needed for its delivery from injection wells to production wells in washed-through part of pool are found. Then grouting mortar in the amount corresponding to volume of fluid pumped for delivery of indicator is pumped under pressure 2 to 10% higher than working pressure of injection. Later new rows of injection wells from number of flooded production wells are formed with their arrangement in parallel to direction of zone of maximum jointing. In process of further development of oil field working fluid is pumped under pressure across face of injection wells below pressure of opening of cracks. EFFECT: increased recovery of oil from field.
Title | Year | Author | Number |
---|---|---|---|
METHOD OF PRODUCING OIL IN POROUS FRACTURED RESERVOIRS REDUCING WELL PRODUCT WATER CONTENT | 2011 |
|
RU2465446C1 |
METHOD FOR DEVELOPING OIL DEPOSIT | 1995 |
|
RU2061178C1 |
METHOD OF DEVELOPING OIL POOL IN FRACTURED-POROUS CARBONATE BASINS | 2010 |
|
RU2463445C2 |
METHOD OF DEVELOPING OIL DEPOSIT WITH CARBONATE FISSURED RESERVOIRS | 2002 |
|
RU2196885C1 |
EARLY IDENTIFICATION METHOD OF NATURAL FRACTURING OF FORMATIONS | 2011 |
|
RU2478773C2 |
PROCESS OF EXPLOITATION OF OIL FIELD | 2000 |
|
RU2170345C1 |
METHOD OF DEVELOPING OIL DEPOSIT IN CARBONATE RESERVOIRS OF FISSURED TYPE | 1996 |
|
RU2101474C1 |
METHOD FOR MULTIPAY FIELD SURVEY AND DEVELOPMENT | 2005 |
|
RU2315863C2 |
OIL DEPOSIT DEVELOPMENT METHOD | 2023 |
|
RU2814676C1 |
METHOD FOR DEVELOPMENT OF DEPOSIT WITH HARD-TO-RECOVER OIL RESERVES | 1997 |
|
RU2109133C1 |
Authors
Dates
2002-05-20—Published
2001-08-29—Filed